{"title":"The Tortuous Road from St. Thomas to River Garden","authors":"Lawrence J. Vale","doi":"10.1093/OSO/9780190624330.003.0005","DOIUrl":null,"url":null,"abstract":"Chapter 4 follows the tortuous course that led St. Thomas to its redevelopment, revealing the machinations of a governance constellation centered on the prerogatives of the Big Developer. Starting in the late 1980s, the struggling housing project had multiple suitors eager to launch a transformation. The redevelopment effort faced a long series of false starts and endured multiple lawsuits and setbacks. Eventually, championed by maverick developer Pres Kabacoff, this yielded the mixed-income community of River Garden, completed in phases between 2001 and 2009. Although the initial HOPE VI application had proposed a majority of low-income housing on the site, subsequent proposals shifted to plans emphasizing market-rate and tax-credit housing plus a Walmart supercenter, with additional scattered-site public housing for large families promised but never constructed. Eventually, however, market conditions soured and the actual development that got built has far less market-rate housing than this midcourse correction had sought to deliver.","PeriodicalId":239940,"journal":{"name":"After the Projects","volume":"3 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-12-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"After the Projects","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1093/OSO/9780190624330.003.0005","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Chapter 4 follows the tortuous course that led St. Thomas to its redevelopment, revealing the machinations of a governance constellation centered on the prerogatives of the Big Developer. Starting in the late 1980s, the struggling housing project had multiple suitors eager to launch a transformation. The redevelopment effort faced a long series of false starts and endured multiple lawsuits and setbacks. Eventually, championed by maverick developer Pres Kabacoff, this yielded the mixed-income community of River Garden, completed in phases between 2001 and 2009. Although the initial HOPE VI application had proposed a majority of low-income housing on the site, subsequent proposals shifted to plans emphasizing market-rate and tax-credit housing plus a Walmart supercenter, with additional scattered-site public housing for large families promised but never constructed. Eventually, however, market conditions soured and the actual development that got built has far less market-rate housing than this midcourse correction had sought to deliver.