Practical commitment of combined cycle plants using dynamic programming

Juan Álvarez López, Rolando Nieva Gómez, Isaías Guillén Moya
{"title":"Practical commitment of combined cycle plants using dynamic programming","authors":"Juan Álvarez López, Rolando Nieva Gómez, Isaías Guillén Moya","doi":"10.1109/EPEC.2010.5697171","DOIUrl":null,"url":null,"abstract":"Due to the existence and building of an important number of combined cycle plants throughout electric power systems around the world, there exists the growing need to have a more accurate model to represent these type of power plants when solving the unit commitment problem. A commonly used optimization technique to solve the unit commitment problem is dual programming. This work focuses on solving the subproblem of scheduling a combined cycle plant using dynamic programming under a dual optimization scheme. The model used to represent the combined cycle plants is based on configurations; this new model takes into account such constraints as the feasible transitions between configurations, and the minimum and maximum time that a combined cycle plant must remain on a certain configuration. This model accurately represents the reallife characteristics of combined cycle plants like different start-up sequences and different stopping conditions. One novelty of this model is that the representation of each one of the states and configurations is done with a single integer state index that consecutively sums the time that the combined cycle plant must remain on each state or configuration. The use of this integer state index simplifies the state-space diagrams and reduces the number of integer/binary variables in the model. Another novelty is the modeling of Hybrid Combined Cycle Plants; these are the ones that use an auxiliary boiler in order to increase the production of steam.","PeriodicalId":393869,"journal":{"name":"2010 IEEE Electrical Power & Energy Conference","volume":"96 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 IEEE Electrical Power & Energy Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EPEC.2010.5697171","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

Abstract

Due to the existence and building of an important number of combined cycle plants throughout electric power systems around the world, there exists the growing need to have a more accurate model to represent these type of power plants when solving the unit commitment problem. A commonly used optimization technique to solve the unit commitment problem is dual programming. This work focuses on solving the subproblem of scheduling a combined cycle plant using dynamic programming under a dual optimization scheme. The model used to represent the combined cycle plants is based on configurations; this new model takes into account such constraints as the feasible transitions between configurations, and the minimum and maximum time that a combined cycle plant must remain on a certain configuration. This model accurately represents the reallife characteristics of combined cycle plants like different start-up sequences and different stopping conditions. One novelty of this model is that the representation of each one of the states and configurations is done with a single integer state index that consecutively sums the time that the combined cycle plant must remain on each state or configuration. The use of this integer state index simplifies the state-space diagrams and reduces the number of integer/binary variables in the model. Another novelty is the modeling of Hybrid Combined Cycle Plants; these are the ones that use an auxiliary boiler in order to increase the production of steam.
基于动态规划的联合循环电厂的实际承诺
由于世界各地的电力系统中存在和建设了大量的联合循环电厂,因此在解决机组承诺问题时,越来越需要一个更准确的模型来表示这些类型的电厂。双规划是解决机组投入问题的一种常用的优化技术。研究了在双优化方案下,利用动态规划方法求解联合循环电厂调度子问题。用于表示联合循环装置的模型是基于构型的;这个新模型考虑了多种配置之间的可行转换以及联合循环电厂必须保持在某种配置上的最小和最大时间等约束条件。该模型准确地反映了联合循环装置不同启动顺序和不同停止条件的实际特性。该模型的一个新颖之处在于,每个状态和配置的表示都是通过单个整数状态索引完成的,该索引连续求和联合循环工厂必须保持在每个状态或配置上的时间。这种整数状态索引的使用简化了状态空间图,并减少了模型中整数/二进制变量的数量。另一个新颖之处是混合联合循环装置的建模;这些是使用辅助锅炉来增加蒸汽产量的锅炉。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信