Analysis Of Solar Power Plant Utilization For Public Street Lighting In Probolinggo, Jawa Timur, Indonesia

Fahmy Rinanda Saputri, Adrix Richard Stanlee, Indra Hadi Prasetya, Sarah Delana Wijaya
{"title":"Analysis Of Solar Power Plant Utilization For Public Street Lighting In Probolinggo, Jawa Timur, Indonesia","authors":"Fahmy Rinanda Saputri, Adrix Richard Stanlee, Indra Hadi Prasetya, Sarah Delana Wijaya","doi":"10.46729/ijstm.v4i4.862","DOIUrl":null,"url":null,"abstract":"Fossil fuels namely coal, petroleum, and natural gas have long been chosen as the main energy sources in meeting global energy needs. However, fossil fuels have the main problem in that their amount is limited and causes global warming. To overcome these problems, renewable energy such as solar energy can be used. Solar energy can be converted into electrical energy by using solar panels. The installation of a solar power plant certainly requires a large budget, to check its feasibility and can be simulated using PVSyst and RETScreen. In particular, PVSyst is used to search for the amount of material needed, the power capacity produced, and energy losses (there is energy lost). Then, RETScreen is used to calculate photovoltaic installation costs, operational and maintenance costs after photovoltaic installation, and emissions. Probolinggo has enormous potential to use solar power plants with Photovoltaic modules. This study simulates the installation of photovoltaic modules in Probolinggo which still has shortcomings in terms of public street lighting. From the simulations carried out, it can be concluded that Probolinggo is feasible for the installation of the solar power plant. With PVSyst, the total number of photovoltaic modules installed is 15,112 pieces. The total power generated is 10,145 MWh. Then, by using RETScreen, a photovoltaic installation fee of Rp142,978,410,000 was obtained. and annual maintenance costs of Rp1,281,870,000.","PeriodicalId":384527,"journal":{"name":"International Journal of Science, Technology & Management","volume":"40 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-07-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Science, Technology & Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.46729/ijstm.v4i4.862","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Fossil fuels namely coal, petroleum, and natural gas have long been chosen as the main energy sources in meeting global energy needs. However, fossil fuels have the main problem in that their amount is limited and causes global warming. To overcome these problems, renewable energy such as solar energy can be used. Solar energy can be converted into electrical energy by using solar panels. The installation of a solar power plant certainly requires a large budget, to check its feasibility and can be simulated using PVSyst and RETScreen. In particular, PVSyst is used to search for the amount of material needed, the power capacity produced, and energy losses (there is energy lost). Then, RETScreen is used to calculate photovoltaic installation costs, operational and maintenance costs after photovoltaic installation, and emissions. Probolinggo has enormous potential to use solar power plants with Photovoltaic modules. This study simulates the installation of photovoltaic modules in Probolinggo which still has shortcomings in terms of public street lighting. From the simulations carried out, it can be concluded that Probolinggo is feasible for the installation of the solar power plant. With PVSyst, the total number of photovoltaic modules installed is 15,112 pieces. The total power generated is 10,145 MWh. Then, by using RETScreen, a photovoltaic installation fee of Rp142,978,410,000 was obtained. and annual maintenance costs of Rp1,281,870,000.
印尼爪哇帖木儿Probolinggo市公共街道照明太阳能发电厂利用分析
长期以来,煤炭、石油和天然气等化石燃料一直被选为满足全球能源需求的主要能源。然而,化石燃料的主要问题在于其数量有限,并导致全球变暖。为了克服这些问题,可以使用太阳能等可再生能源。利用太阳能板可以将太阳能转化为电能。太阳能发电厂的安装当然需要大量的预算,为了检查其可行性,可以使用PVSyst和RETScreen进行模拟。特别是,PVSyst用于搜索所需材料的数量,产生的功率容量和能量损失(有能量损失)。然后,使用RETScreen计算光伏安装成本、光伏安装后的运行维护成本和排放量。Probolinggo在使用光伏组件的太阳能发电厂方面具有巨大的潜力。本研究模拟了Probolinggo的光伏组件安装情况,Probolinggo在公共街道照明方面仍然存在不足。仿真结果表明,Probolinggo对太阳能电站的安装是可行的。使用PVSyst,光伏组件安装总数为15,112块。总发电量为10145兆瓦时。然后,通过RETScreen,获得光伏安装费为Rp142,978,410,000。年维护费1,281,870,000印尼盾。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信