ANALISIS DAMPAK PEMBANGUNAN TOL CISUMDAWU SEKSI 2 FASE 2 TERHADAP PEREKONOMIAN PENDUDUK SEKITAR (Studi Deskriptif Kualitatif Terhadap Penduduk Dusun.Gawiru, Desa Girimukti, Kecamatan.Sumedang.Utara, Kabupaten.Sumedang-Provinsi Jawa.Barat)

T. Santosa, Trisnawati Kusumawardhani
{"title":"ANALISIS DAMPAK PEMBANGUNAN TOL CISUMDAWU SEKSI 2 FASE 2 TERHADAP PEREKONOMIAN PENDUDUK SEKITAR (Studi Deskriptif Kualitatif Terhadap Penduduk Dusun.Gawiru, Desa Girimukti, Kecamatan.Sumedang.Utara, Kabupaten.Sumedang-Provinsi Jawa.Barat)","authors":"T. Santosa, Trisnawati Kusumawardhani","doi":"10.53990/djep.v1i1.67","DOIUrl":null,"url":null,"abstract":"The construction of the Phase 2 Cisumdawu toll road, located in Gawiru Hamlet, Girimukti Village, Sumedang District, Sumedang Regency, West Java, has an impact on the surrounding population. Both positive and negative impacts. The positive impact is that the surrounding population is empowered to do work outside of project work such as cooking services, clothes washing services, mess cleaning services and project offices, daily warehouse clerk services (checking supplies of material goods), field survey implementers, security, foreman, local subcontractor, plagman. The negative impact is the lack of buyers for traders around Jalan Cadas Pangeran. Infrastructure development should be followed by human development. According to UNDP, indicators of the success of human development include 1) equity, namely equitable distribution of development results, equitable distribution to be able to easily access primary human needs (clothing, food, shelter), the need for health services that have now gone through BPJS, the need for education which is now running with the SPP-free program for state schools, 2) the ability of every human being to be productive according to their creativity and innovation, 3) empowerment, namely growth and human resource development that the government strives for. This study uses a qualitative methodology by conducting in-depth interviews, while the paradigm of this research is constructivism","PeriodicalId":194095,"journal":{"name":"Develop: Jurnal Ekonomi Pembangunan","volume":"13 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-06-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Develop: Jurnal Ekonomi Pembangunan","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.53990/djep.v1i1.67","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The construction of the Phase 2 Cisumdawu toll road, located in Gawiru Hamlet, Girimukti Village, Sumedang District, Sumedang Regency, West Java, has an impact on the surrounding population. Both positive and negative impacts. The positive impact is that the surrounding population is empowered to do work outside of project work such as cooking services, clothes washing services, mess cleaning services and project offices, daily warehouse clerk services (checking supplies of material goods), field survey implementers, security, foreman, local subcontractor, plagman. The negative impact is the lack of buyers for traders around Jalan Cadas Pangeran. Infrastructure development should be followed by human development. According to UNDP, indicators of the success of human development include 1) equity, namely equitable distribution of development results, equitable distribution to be able to easily access primary human needs (clothing, food, shelter), the need for health services that have now gone through BPJS, the need for education which is now running with the SPP-free program for state schools, 2) the ability of every human being to be productive according to their creativity and innovation, 3) empowerment, namely growth and human resource development that the government strives for. This study uses a qualitative methodology by conducting in-depth interviews, while the paradigm of this research is constructivism
分析奇sumdawu section 2阶段2对周围经济的影响(对农村居民的描述性定性研究)。Gawiru, Girimukti村,Sumedang街。北方,县。西爪哇Sumedang-Provinsi。)
位于西爪哇Sumedang县Sumedang区Girimukti村Gawiru哈姆雷特的第二阶段Cisumdawu收费公路的建设对周围人口产生了影响。正面和负面影响都有。积极的影响是,周围的人口被授权从事项目工作以外的工作,如烹饪服务、洗衣服务、食堂清洁服务和项目办公室、日常仓库文员服务(检查物资供应)、实地调查执行者、保安、工头、当地分包商、plagman。负面影响是贾兰卡达斯潘吉兰附近的贸易商缺乏买家。基础设施建设要推进人的发展。开发计划署认为,人类发展成功的指标包括:1)公平,即公平分配发展成果;公平分配,使人们能够容易地获得基本的人类需求(衣服、食物、住所);对保健服务的需求,现在通过BPJS实现;对教育的需求,现在通过公立学校无spp方案实现;2)每个人根据其创造力和创新能力进行生产的能力;3)授权,即政府所追求的增长和人力资源开发。本研究采用深度访谈的定性研究方法,研究范式为建构主义
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信