Managing Asset Integrity and Safe Operations at the Bahrain Petroleum Company: Operational Assets in Unfenced/Unmanned Areas

Aby K. Thomas
{"title":"Managing Asset Integrity and Safe Operations at the Bahrain Petroleum Company: Operational Assets in Unfenced/Unmanned Areas","authors":"Aby K. Thomas","doi":"10.1115/pvp2019-93190","DOIUrl":null,"url":null,"abstract":"INTRODUCTION: Managing operational assets outside the Refinery, in unfenced/unmanned areas is of paramount importance for the successful and safe operations of the company. Operational assets include gas, oil and utility pipelines, distribution and metering stations, valve stations, power distribution cables and such other assets. These assets are ‘on land’ inside populated urban areas, desert locations and sub-sea installations. Primarily, company’s operational assets are protected by constant patrolling by the nation’s public security agencies and also by the company security department. However risks to the company’s operational assets arise from Contractors engaged by the company to perform any work on the asset or near the asset or other agencies including ministries or utility companies or authorities engaging their Contractors in carrying out new installation or maintenance work of their own assets located in and around company assets. In the context of Bahrain as a nation, the oil and gas industry contributes substantially to the economy and hence it is very important that all necessary processes are established to protect operational assets. When work is performed by Contractors not directly within operational control i.e. taking place in remote, normally unmanned or minimally manned facilities the inherent risk is high and has to be managed through legally mandated processes.\n SITUATIONAL ANALYSIS: Bapco has an established ‘Process Safety Management’ (PSM) system accepted and implemented in the company. The ‘Safe Work Permit’ system is a very critical control system/measure to ensure Contractor compliance when performing any work. Coupled with the effectiveness of PSM and Contractor Safety process the Government of Bahrain mandated legally binding process of the ‘Wayleave’ system along with other processes such as Planning Permission, helps in enforcing control of company’s operational assets in company’s unfenced or remote areas with minimal or no manning. A procedure for ‘Processing of Planning Permissions and Wayleave pertaining to BAPCO’s Unfenced Areas’ has been developed based on engineering design requirements basis international design codes and best professional practices. Details of these practices will be described and illustrated in the detailed presentation.\n PRESENTATION/CONCLUSION: Bapco has over the past years developed procedures and processes to manage operational assets/ areas within the Oil and Gas Fields, Oil transmission pipelines and the ‘Right-of-Way’, Gas Distribution Network and the ‘Right-of-Way’, Refinery, Tank Farms and its own Shipping Wharf Operations in keeping with the highest engineering standards, safety and quality requirements. Purpose of this presentation is to list and explain the adaptation of these procedures and processes coupled with pragmatic solutions that forms the basic architecture that aids in controlling the safety and operability of assets in ‘Unfenced/ unmanned Operating Areas’. This ensures generating positive economics and aiding in the growth of the nation’s economy.","PeriodicalId":339189,"journal":{"name":"Volume 7: Operations, Applications, and Components","volume":"21 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-11-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Volume 7: Operations, Applications, and Components","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1115/pvp2019-93190","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

INTRODUCTION: Managing operational assets outside the Refinery, in unfenced/unmanned areas is of paramount importance for the successful and safe operations of the company. Operational assets include gas, oil and utility pipelines, distribution and metering stations, valve stations, power distribution cables and such other assets. These assets are ‘on land’ inside populated urban areas, desert locations and sub-sea installations. Primarily, company’s operational assets are protected by constant patrolling by the nation’s public security agencies and also by the company security department. However risks to the company’s operational assets arise from Contractors engaged by the company to perform any work on the asset or near the asset or other agencies including ministries or utility companies or authorities engaging their Contractors in carrying out new installation or maintenance work of their own assets located in and around company assets. In the context of Bahrain as a nation, the oil and gas industry contributes substantially to the economy and hence it is very important that all necessary processes are established to protect operational assets. When work is performed by Contractors not directly within operational control i.e. taking place in remote, normally unmanned or minimally manned facilities the inherent risk is high and has to be managed through legally mandated processes. SITUATIONAL ANALYSIS: Bapco has an established ‘Process Safety Management’ (PSM) system accepted and implemented in the company. The ‘Safe Work Permit’ system is a very critical control system/measure to ensure Contractor compliance when performing any work. Coupled with the effectiveness of PSM and Contractor Safety process the Government of Bahrain mandated legally binding process of the ‘Wayleave’ system along with other processes such as Planning Permission, helps in enforcing control of company’s operational assets in company’s unfenced or remote areas with minimal or no manning. A procedure for ‘Processing of Planning Permissions and Wayleave pertaining to BAPCO’s Unfenced Areas’ has been developed based on engineering design requirements basis international design codes and best professional practices. Details of these practices will be described and illustrated in the detailed presentation. PRESENTATION/CONCLUSION: Bapco has over the past years developed procedures and processes to manage operational assets/ areas within the Oil and Gas Fields, Oil transmission pipelines and the ‘Right-of-Way’, Gas Distribution Network and the ‘Right-of-Way’, Refinery, Tank Farms and its own Shipping Wharf Operations in keeping with the highest engineering standards, safety and quality requirements. Purpose of this presentation is to list and explain the adaptation of these procedures and processes coupled with pragmatic solutions that forms the basic architecture that aids in controlling the safety and operability of assets in ‘Unfenced/ unmanned Operating Areas’. This ensures generating positive economics and aiding in the growth of the nation’s economy.
管理巴林石油公司的资产完整性和安全作业:无围栏/无人区域的作业资产
简介:管理炼油厂以外的运营资产,在无围栏/无人区域,对于公司的成功和安全运营至关重要。运营资产包括天然气、石油和公用事业管道、分配和计量站、阀站、配电电缆和其他资产。这些资产位于人口稠密的城市地区、沙漠地区和海底设施的“陆地上”。首先,公司的经营性资产是由国家公安机关和公司保安部门不断巡逻保护的。然而,公司经营性资产的风险来自于公司雇用的承包商在资产上或资产附近进行任何工作,或其他机构,包括部委、公用事业公司或当局,雇用其承包商对位于公司资产内或周围的自己的资产进行新的安装或维护工作。在巴林作为一个国家的背景下,石油和天然气工业对经济的贡献很大,因此建立所有必要的流程来保护运营资产是非常重要的。当承包商进行的工作不直接在操作控制范围内,即在偏远,通常无人或最少有人的设施中进行时,固有的风险很高,必须通过法律规定的程序进行管理。情景分析:Bapco建立了“过程安全管理”(PSM)体系,并在公司内得到认可和实施。“安全工作许可证”制度是一项非常重要的控制系统/措施,以确保承包商在执行任何工作时遵守规定。再加上PSM和承包商安全流程的有效性,巴林政府强制实施了具有法律约束力的“Wayleave”系统流程,以及规划许可等其他流程,有助于在公司未设防或偏远地区实施对公司运营资产的控制,只需极少或无需人员。根据国际设计规范和最佳专业实践的工程设计要求,制定了“与BAPCO非隔离区有关的规划许可和道路许可的处理”程序。这些实践的细节将在详细的演示文稿中进行描述和说明。介绍/结论:在过去的几年里,Bapco已经制定了程序和流程来管理油气田、石油输送管道和“路权”、天然气分销网络和“路权”、炼油厂、油库和自己的航运码头业务内的运营资产/区域,以保持最高的工程标准、安全和质量要求。本次演讲的目的是列出并解释这些程序和过程的适应性,以及形成基本架构的实用解决方案,这些架构有助于控制“无围栏/无人操作区域”资产的安全性和可操作性。这确保产生积极的经济和帮助国家经济的增长。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信