Miradha Herdini Widiatmi, S. Amin, Ridho Prima Oktansyah, A. Asmoro, K. Gunawan, T. R. Biyanto
{"title":"3R Implementation in Waste Management at PT. PJB UP Muara Tawar","authors":"Miradha Herdini Widiatmi, S. Amin, Ridho Prima Oktansyah, A. Asmoro, K. Gunawan, T. R. Biyanto","doi":"10.9790/487X-1906056470","DOIUrl":null,"url":null,"abstract":"The waste problem are also an important issue for PT. PJB UP Muara Tawar power plant. The waste can contaminate the rain and river water, then flow to the sea. As we know, the power plant condenser utilize sea water as cooling fulid. The sea water will flow through pump and filter. The waste contamined in water sea has posibility to clog the intake of filter. As point of view from management of PT. PJB UP Muara Tawar, the sea water pollution due to solid waste can affect the operation and maintenance of power plant, meanwhile, it can impact to the society health awareness. Hence, this program is very important to the company and society and it is in line with Sustainable Development Goals (SDGs) i.e. \"clean water and proper sanitation\". This program was initiated by PT. PJB UP Muara Tawar and it is perfomed by employment with the main objective improve clean environmental and society healthy. Waste reduction is done by reduce the use of objects that can generate waste, waste disposal according to type, and advanced processing of waste such as composting. This program have been succesfull implemented. From this program the amount of solid waste are reduced. Organic waste are reduced by 0.8 ton in 2013, 511 ton in 2014, 401 ton in 2015 and 271 ton in 2016. Inorganic waste are reduced 19 ton in 2013, 529 ton in 2014, 418 ton in 2015 and 279 ton in 2016.","PeriodicalId":165213,"journal":{"name":"IOSR Journal of Business and Management","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IOSR Journal of Business and Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.9790/487X-1906056470","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
The waste problem are also an important issue for PT. PJB UP Muara Tawar power plant. The waste can contaminate the rain and river water, then flow to the sea. As we know, the power plant condenser utilize sea water as cooling fulid. The sea water will flow through pump and filter. The waste contamined in water sea has posibility to clog the intake of filter. As point of view from management of PT. PJB UP Muara Tawar, the sea water pollution due to solid waste can affect the operation and maintenance of power plant, meanwhile, it can impact to the society health awareness. Hence, this program is very important to the company and society and it is in line with Sustainable Development Goals (SDGs) i.e. "clean water and proper sanitation". This program was initiated by PT. PJB UP Muara Tawar and it is perfomed by employment with the main objective improve clean environmental and society healthy. Waste reduction is done by reduce the use of objects that can generate waste, waste disposal according to type, and advanced processing of waste such as composting. This program have been succesfull implemented. From this program the amount of solid waste are reduced. Organic waste are reduced by 0.8 ton in 2013, 511 ton in 2014, 401 ton in 2015 and 271 ton in 2016. Inorganic waste are reduced 19 ton in 2013, 529 ton in 2014, 418 ton in 2015 and 279 ton in 2016.
废物问题也是PT. PJB UP Muara Tawar电厂的一个重要问题。废物会污染雨水和河水,然后流入大海。我们知道,电厂的冷凝器利用海水作为冷却液。海水将流过水泵和过滤器。海水中污染的废物有可能堵塞过滤器的进气口。从Muara Tawar电厂管理层的角度来看,固体废物造成的海水污染不仅会影响电厂的运行和维护,还会影响社会的健康意识。因此,该计划对公司和社会非常重要,它符合可持续发展目标(sdg),即:“干净的水和适当的卫生设施”。该方案由PJB UP Muara Tawar PT发起,由就业部门执行,主要目标是改善清洁环境和社会健康。减少废物是通过减少使用可产生废物的物体,按类型处理废物,以及对废物进行堆肥等高级处理来实现的。该方案已成功实施。通过这个项目,固体废物的数量减少了。2013年减少有机废物0.8吨,2014年减少511吨,2015年减少401吨,2016年减少271吨。2013年减少无机废弃物19吨,2014年减少529吨,2015年减少418吨,2016年减少279吨。