{"title":"Power Quality Park - Idea and feasibility study","authors":"G. Błajszczak, P. Antos","doi":"10.1109/PQ.2010.5550026","DOIUrl":null,"url":null,"abstract":"A new industrial area will be established in the north of Poland. This area is dedicated to factories and businesses that require extremely high quality of power supply. For this reason it is called the “Power Quality Park”. This paper describes important designing and organizational aspects of ensuring necessary level of power quality. The project is implemented by a group of companies including the Polish transmission system operator and the owner of Polish transmission network: PSE Operator S.A.","PeriodicalId":356169,"journal":{"name":"Proceedings of the 2010 Electric Power Quality and Supply Reliability Conference","volume":"5 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-06-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"13","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 2010 Electric Power Quality and Supply Reliability Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PQ.2010.5550026","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 13
Abstract
A new industrial area will be established in the north of Poland. This area is dedicated to factories and businesses that require extremely high quality of power supply. For this reason it is called the “Power Quality Park”. This paper describes important designing and organizational aspects of ensuring necessary level of power quality. The project is implemented by a group of companies including the Polish transmission system operator and the owner of Polish transmission network: PSE Operator S.A.