Multi-agent Just-in-Time Manufacturing Scheduling System for Dynamic Environment

Y. Jiang, W. Weng, S. Fujimura
{"title":"Multi-agent Just-in-Time Manufacturing Scheduling System for Dynamic Environment","authors":"Y. Jiang, W. Weng, S. Fujimura","doi":"10.1109/IIAI-AAI.2016.44","DOIUrl":null,"url":null,"abstract":"This article proposes a novel method to solve the manufacturing scheduling problems in multi-agent system (MAS) for dynamic environment. The study focuses on the machine selection work for jobs and proposes a remaining time prediction method, which will help a job choose machines based on estimated finishing time. In this way, we can keep the job finishing just-in-time, which aims to support a customer-oriented lead time policy, and can provide better manufacturing performance and increase customer service level. This article provides experimental results compared with another approach in previous research, through which we can find that in some case if we put the Just-in-time philosophy into consideration, the proposed method will deliver competitive performance.","PeriodicalId":272739,"journal":{"name":"2016 5th IIAI International Congress on Advanced Applied Informatics (IIAI-AAI)","volume":"44 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 5th IIAI International Congress on Advanced Applied Informatics (IIAI-AAI)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IIAI-AAI.2016.44","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

This article proposes a novel method to solve the manufacturing scheduling problems in multi-agent system (MAS) for dynamic environment. The study focuses on the machine selection work for jobs and proposes a remaining time prediction method, which will help a job choose machines based on estimated finishing time. In this way, we can keep the job finishing just-in-time, which aims to support a customer-oriented lead time policy, and can provide better manufacturing performance and increase customer service level. This article provides experimental results compared with another approach in previous research, through which we can find that in some case if we put the Just-in-time philosophy into consideration, the proposed method will deliver competitive performance.
动态环境下的多智能体准时制制造调度系统
提出了一种解决动态环境下多智能体系统(MAS)制造调度问题的新方法。研究了作业的机器选择工作,提出了一种剩余时间预测方法,该方法可以帮助作业根据预估的完成时间选择机器。通过这种方式,我们可以保持工作按时完成,旨在支持以客户为导向的交货期政策,并可以提供更好的制造性能和提高客户服务水平。本文提供的实验结果与之前的研究中的另一种方法进行了比较,通过实验结果我们可以发现,在某些情况下,如果我们考虑到准时制哲学,所提出的方法将提供具有竞争力的性能。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信