Effective project management with PMCP on application system (AS)

D. Telfer
{"title":"Effective project management with PMCP on application system (AS)","authors":"D. Telfer","doi":"10.1109/STIER.1990.324639","DOIUrl":null,"url":null,"abstract":"The application system (AS) provides a powerful VM/MVS host based facility to automate the tasks required to manage and control projects. The front-end menu-driven application, project management control package (PMCP), simplifies and organizes the functions AS provides for project management. PMCP provides an online method for recording and organizing project activity information, generating schedules with recommended start and end dates, recording activity progress, and project reporting both statistically and graphically. The functions provided in PMCP are utilized for the planning and execution of a sample project. PMCP on AS initially generates schedules based on effort, resources, relationships, and calendars. It facilitates progress tracking and schedule revisions. Progress reporting can be done with activity reports, Gantt charts, or graphic plots.<<ETX>>","PeriodicalId":166693,"journal":{"name":"IEEE Technical Conference on Southern Tier","volume":"64 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1990-04-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Technical Conference on Southern Tier","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/STIER.1990.324639","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The application system (AS) provides a powerful VM/MVS host based facility to automate the tasks required to manage and control projects. The front-end menu-driven application, project management control package (PMCP), simplifies and organizes the functions AS provides for project management. PMCP provides an online method for recording and organizing project activity information, generating schedules with recommended start and end dates, recording activity progress, and project reporting both statistically and graphically. The functions provided in PMCP are utilized for the planning and execution of a sample project. PMCP on AS initially generates schedules based on effort, resources, relationships, and calendars. It facilitates progress tracking and schedule revisions. Progress reporting can be done with activity reports, Gantt charts, or graphic plots.<>
在应用系统(AS)上使用PMCP进行有效的项目管理
应用系统(AS)提供了一个强大的基于VM/MVS主机的工具来自动执行管理和控制项目所需的任务。前端菜单驱动的应用程序项目管理控制包(PMCP)简化和组织了AS为项目管理提供的功能。PMCP提供了一种在线方法,用于记录和组织项目活动信息,生成具有推荐开始和结束日期的时间表,记录活动进度,并以统计和图形方式报告项目。利用PMCP中提供的功能来规划和执行一个示例项目。AS上的PMCP最初根据工作、资源、关系和日历生成时间表。它促进了进度跟踪和时间表修订。进度报告可以用活动报告、甘特图或图形来完成。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信