{"title":"PLTS Hybrid Power Plant Design – 3000 VA Fuel Generator in the Tourism Village of Cilintung Garut Village","authors":"Imran Al Hafiz, Teguh Arfianto, Waluyo Waluyo","doi":"10.26760/rekaelkomika.v3i2.70-79","DOIUrl":null,"url":null,"abstract":"This study discusses the design of a 3000 VA PLTS-BBM hybrid power generation system in the tourist village of Kampung Cilintung Situgede Karangpawitan Garut. This is necessary because an energy tourism area will be built there, and it requires an adequate supply of electricity. PLTS is the main electricity supplier combined with the uses of fuel generators to harnest solar radiation in the area. The determination of the initial power energy requirement is 3000 VA or 2550 watts for 18 hours of use so that the energy required is 45900 Wh. The rating of the device used is 48 V. The number of solar panels are 14 panels connected in series-parallel, using 24 units of battery. The generator used is a gasoline generator with a four-stroke engine having a capacity of 3000 W with an electrical output of 220 V AC. The design process also makes use of the PVSyst application. The design of this solar module will be realized in form of a powerhouse to supply the entire tourist village area.","PeriodicalId":339204,"journal":{"name":"REKA ELKOMIKA: Jurnal Pengabdian kepada Masyarakat","volume":"29 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-06-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"REKA ELKOMIKA: Jurnal Pengabdian kepada Masyarakat","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.26760/rekaelkomika.v3i2.70-79","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This study discusses the design of a 3000 VA PLTS-BBM hybrid power generation system in the tourist village of Kampung Cilintung Situgede Karangpawitan Garut. This is necessary because an energy tourism area will be built there, and it requires an adequate supply of electricity. PLTS is the main electricity supplier combined with the uses of fuel generators to harnest solar radiation in the area. The determination of the initial power energy requirement is 3000 VA or 2550 watts for 18 hours of use so that the energy required is 45900 Wh. The rating of the device used is 48 V. The number of solar panels are 14 panels connected in series-parallel, using 24 units of battery. The generator used is a gasoline generator with a four-stroke engine having a capacity of 3000 W with an electrical output of 220 V AC. The design process also makes use of the PVSyst application. The design of this solar module will be realized in form of a powerhouse to supply the entire tourist village area.
林东加鲁特村旅游村3000va燃料发电机的PLTS混合电厂设计
本研究探讨了Kampung Cilintung sitgede Karangpawitan Garut旅游村3000 VA PLTS-BBM混合发电系统的设计。这是必要的,因为那里将建立一个能源旅游区,它需要充足的电力供应。PLTS是主要的电力供应商,结合使用燃料发电机来收集该地区的太阳辐射。确定初始电源能量需求为3000va或2550瓦,使用18小时,则所需能量为45900 Wh。所用设备的额定电压为48v。太阳能电池板的数量是14块板串联并联,使用24块电池。所使用的发电机是一台汽油发电机,配备四冲程发动机,容量为3000w,输出电压为220v AC。设计过程中还使用了PVSyst应用程序。这个太阳能组件的设计将以发电站的形式实现,为整个旅游村庄地区提供电力。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信