{"title":"Analysis of Engineering Performance","authors":"H. Versteege","doi":"10.1109/IRET-EM.1961.5007594","DOIUrl":null,"url":null,"abstract":"An analytical scheme is presented for measuring the physical completion of engineering effort and relating this to the appropriate segment of a budget curve, representing planned expenditure of effort. The method was developed in connection with weapons systems projects. A measure (the delta factor) is devised of the variation of actual physical engineering completion from the standard or expected value. A computational algorithm for the delta formula is given. Illustrations are given of its use as a diagnostic tool.","PeriodicalId":382847,"journal":{"name":"IRE Transactions on Engineering Management","volume":"126 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1961-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IRE Transactions on Engineering Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IRET-EM.1961.5007594","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
An analytical scheme is presented for measuring the physical completion of engineering effort and relating this to the appropriate segment of a budget curve, representing planned expenditure of effort. The method was developed in connection with weapons systems projects. A measure (the delta factor) is devised of the variation of actual physical engineering completion from the standard or expected value. A computational algorithm for the delta formula is given. Illustrations are given of its use as a diagnostic tool.