Our Infrastructure is Aging and Maintenance Costs are Rising -- Extending the Life Expectancy of Transmission Lines Through the Use of Data, Inspection and Planning
{"title":"Our Infrastructure is Aging and Maintenance Costs are Rising -- Extending the Life Expectancy of Transmission Lines Through the Use of Data, Inspection and Planning","authors":"J.L. Johnson","doi":"10.1109/TDCLLM.2006.340748","DOIUrl":null,"url":null,"abstract":"To meet the growing need of expanded 69 kV maintenance projects and new transmission construction, one utility has brought engineering and transmission personnel together to create a team whose goal is to provide a consistent approach for defining projects, creating job orders and scheduling work without increasing staff or spending.","PeriodicalId":193517,"journal":{"name":"ESMO 2006 - 2006 IEEE 11th International Conference on Transmission & Distribution Construction, Operation and Live-Line Maintenance","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"ESMO 2006 - 2006 IEEE 11th International Conference on Transmission & Distribution Construction, Operation and Live-Line Maintenance","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDCLLM.2006.340748","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5
Abstract
To meet the growing need of expanded 69 kV maintenance projects and new transmission construction, one utility has brought engineering and transmission personnel together to create a team whose goal is to provide a consistent approach for defining projects, creating job orders and scheduling work without increasing staff or spending.