{"title":"Improvement of Distribution System Maintenance Plan Based on Risk Level","authors":"Fengsheng Yang, Guanglin Cai, Linbo Wang, Fengzhang Luo, Tianyu Zhang, Yue Liu","doi":"10.1109/CICED.2018.8592535","DOIUrl":null,"url":null,"abstract":"The current general maintenance plan of the power distribution system is mainly based on periodical overhaul and troubleshooting, and has the problems of poor real-time performance and low accuracy. By comprehensively considering the real-time health status of the distribution system and the importance from multisource of the distribution equipment, the original maintenance plan is improved and a practical maintenance plan for the power distribution equipment based on the risk level is proposed. Firstly, the real-time health of the equipment is determined based on the state of the equipment's state evaluation index. The index model is used to calculate the equipment's real-time failure rate, and then the importance of the equipment is described in terms of equipment value, environment, personal safety, and user loss. The risk cost and risk level index of the equipment are determined by combining the real-time failure rate and importance index, and a color difference labeling method is used to formulate the differential maintenance plan. Finally, an example is given to verify the effectiveness of the method. The results show that the method can obtain the health status of the distribution equipment in time through real-time status assessment. At the same time, defining the importance of the equipment from the perspective of the entire distribution network security overcomes the disadvantages of only taking into account the risk of the equipment itself, and the color annotation method can be more intuitive. To mark the equipment risk level.","PeriodicalId":142885,"journal":{"name":"2018 China International Conference on Electricity Distribution (CICED)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2018-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 China International Conference on Electricity Distribution (CICED)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CICED.2018.8592535","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

The current general maintenance plan of the power distribution system is mainly based on periodical overhaul and troubleshooting, and has the problems of poor real-time performance and low accuracy. By comprehensively considering the real-time health status of the distribution system and the importance from multisource of the distribution equipment, the original maintenance plan is improved and a practical maintenance plan for the power distribution equipment based on the risk level is proposed. Firstly, the real-time health of the equipment is determined based on the state of the equipment's state evaluation index. The index model is used to calculate the equipment's real-time failure rate, and then the importance of the equipment is described in terms of equipment value, environment, personal safety, and user loss. The risk cost and risk level index of the equipment are determined by combining the real-time failure rate and importance index, and a color difference labeling method is used to formulate the differential maintenance plan. Finally, an example is given to verify the effectiveness of the method. The results show that the method can obtain the health status of the distribution equipment in time through real-time status assessment. At the same time, defining the importance of the equipment from the perspective of the entire distribution network security overcomes the disadvantages of only taking into account the risk of the equipment itself, and the color annotation method can be more intuitive. To mark the equipment risk level.
基于风险等级的配电系统维修计划改进
目前配电系统的一般维护计划主要以定期检修和故障排除为主,存在实时性差、准确性低等问题。综合考虑配电系统的实时健康状态和配电设备多源性的重要性,对原有的维护方案进行了改进,提出了一种基于风险等级的实用配电设备维护方案。首先,根据设备状态评估指标的状态确定设备的实时健康状况;利用指标模型计算设备的实时故障率,然后从设备价值、环境、人身安全、用户损失等方面描述设备的重要性。结合实时故障率和重要性指标确定设备的风险成本和风险等级指标,采用色差标注法制定差别化维修计划。最后通过一个算例验证了该方法的有效性。结果表明,该方法可以通过实时状态评估,及时获取配电设备的健康状态。同时,从整个配电网安全的角度来定义设备的重要性,克服了只考虑设备本身风险的缺点,颜色标注法可以更加直观。标注设备风险等级。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信