{"title":"“PIRAMIDA TINGGI, A State of the Art to Fulfill Obligation of Forestry Permit on Watershed Rehabilitation at PT Pertamina Hulu Mahakam”","authors":"P. Sarwanto","doi":"10.29118/ipa20-g-263","DOIUrl":null,"url":null,"abstract":"Among other obligations imposed under the forestry permit, watershed rehabilitation planting is perceived by the upstream oil and gas sector as the most complex challenge to conquer. Despite its poor track in fulfilling timeline and required result, there are also other challenges to consider, for instance lack of critical location, weather, fire, land tenure, community habit and capability, and cost optimization. In attempt to respond these challenges, an innovation in management system is constructed at PT Pertamina Hulu Mahakam, embracing and tailoring all related challenges, difficulties, and complexities, escalating the activity to be beyond compliance. So that it will be able to deliver more than merely avoid the identified potential risks towards company. The management system, called PIRAMIDA TINGGI (Pemberdayaan Masyarakat untuk Melestarikan Hutan di Dunia demi Ketahanan Energi Nasional), actively involves government, community, and business sector as equilateral triangle that work together to perform watershed rehabilitation planting. Developed using ISO 9001:2015 process approach namely PDCA (Plan-Do-Check-Act), the PIRAMIDA TINGGI system is in line as well with NAWACITA (President Joko Widodo’s vision, mission and program). To encounter other issue found during field work, this system is equipped as well with another innovation tool named PARIDA, a geospatial mobile-desk top-web application that easily able to map and identify vegetation in real time for further geo-analyzing multi-purposes, to be operated by local community. Full set implementation of this system has benefitted all parties. To Company in form of significant cost efficiency around 13.9 MUSD and 7 days’ faster result delivery besides obligation fulfillment, for others in form of broader advantage of proven sustainability project that has gave contribution to 5P (People, Planet, Prosperity, Partnership and Peace), objectives required by UN Sustainable Development Goals 2030.","PeriodicalId":269847,"journal":{"name":"Proc. Indon. Petrol. Assoc., Digital Technical Conference, 2020","volume":"54 11","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-09-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proc. Indon. Petrol. Assoc., Digital Technical Conference, 2020","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29118/ipa20-g-263","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Among other obligations imposed under the forestry permit, watershed rehabilitation planting is perceived by the upstream oil and gas sector as the most complex challenge to conquer. Despite its poor track in fulfilling timeline and required result, there are also other challenges to consider, for instance lack of critical location, weather, fire, land tenure, community habit and capability, and cost optimization. In attempt to respond these challenges, an innovation in management system is constructed at PT Pertamina Hulu Mahakam, embracing and tailoring all related challenges, difficulties, and complexities, escalating the activity to be beyond compliance. So that it will be able to deliver more than merely avoid the identified potential risks towards company. The management system, called PIRAMIDA TINGGI (Pemberdayaan Masyarakat untuk Melestarikan Hutan di Dunia demi Ketahanan Energi Nasional), actively involves government, community, and business sector as equilateral triangle that work together to perform watershed rehabilitation planting. Developed using ISO 9001:2015 process approach namely PDCA (Plan-Do-Check-Act), the PIRAMIDA TINGGI system is in line as well with NAWACITA (President Joko Widodo’s vision, mission and program). To encounter other issue found during field work, this system is equipped as well with another innovation tool named PARIDA, a geospatial mobile-desk top-web application that easily able to map and identify vegetation in real time for further geo-analyzing multi-purposes, to be operated by local community. Full set implementation of this system has benefitted all parties. To Company in form of significant cost efficiency around 13.9 MUSD and 7 days’ faster result delivery besides obligation fulfillment, for others in form of broader advantage of proven sustainability project that has gave contribution to 5P (People, Planet, Prosperity, Partnership and Peace), objectives required by UN Sustainable Development Goals 2030.
“PIRAMIDA TINGGI,履行Pertamina Hulu Mahakam PT流域恢复林业许可义务的最新技术”
在林业许可证规定的其他义务中,上游石油和天然气部门认为流域恢复种植是最复杂的挑战。尽管在完成时间表和要求的结果方面表现不佳,但还需要考虑其他挑战,例如缺乏关键位置、天气、火灾、土地使用权、社区习惯和能力,以及成本优化。为了应对这些挑战,在PT Pertamina Hulu Mahakam建立了一个创新的管理系统,包括并调整所有相关的挑战、困难和复杂性,将活动升级到超越合规性。因此,它将能够提供的不仅仅是避免对公司确定的潜在风险。这个管理系统被称为PIRAMIDA TINGGI (Pemberdayaan Masyarakat untuk Melestarikan Hutan di Dunia demi Ketahanan Energi Nasional),它积极地将政府、社区和商业部门作为一个等边三角形,共同开展流域恢复种植。PIRAMIDA TINGGI系统采用ISO 9001:2015流程方法,即PDCA(计划-执行-检查-行动)开发,与NAWACITA(总统佐科·维多多的愿景、使命和计划)一致。为了解决在实地工作中遇到的其他问题,该系统还配备了另一个创新工具PARIDA,这是一个地理空间移动桌面顶部web应用程序,可以轻松地实时绘制和识别植被,以进一步进行多用途的地理分析,由当地社区操作。这一制度的全面实施使各方受益。对于公司来说,除了履行义务外,还可以获得约13.9亿美元的显著成本效益和7天内更快的交付结果,对于其他公司来说,则可以获得经过验证的可持续发展项目的更广泛优势,为联合国2030年可持续发展目标所要求的5P(人类、地球、繁荣、伙伴关系与和平)做出贡献。