Stand-alone power system with synchronous and asynchronous generators

M. Babescu, C. Chioreanu
{"title":"Stand-alone power system with synchronous and asynchronous generators","authors":"M. Babescu, C. Chioreanu","doi":"10.1109/OPTIM.2008.4602359","DOIUrl":null,"url":null,"abstract":"In the Synchronous Generator (SG)+Asynchronous Generator (AG)+Load (L) system there are, for certain load values, one or three working points. In this paper, we present the correct assessment of the working point with a view to building a mathematical model of generators valid both in stationary and transitory regimes. Numerical simulations and modelling of a stand-alone electric power system has large applications today because of wind aggregates operating in isolated energy supply.","PeriodicalId":244464,"journal":{"name":"2008 11th International Conference on Optimization of Electrical and Electronic Equipment","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2008-05-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"9","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 11th International Conference on Optimization of Electrical and Electronic Equipment","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/OPTIM.2008.4602359","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 9

Abstract

In the Synchronous Generator (SG)+Asynchronous Generator (AG)+Load (L) system there are, for certain load values, one or three working points. In this paper, we present the correct assessment of the working point with a view to building a mathematical model of generators valid both in stationary and transitory regimes. Numerical simulations and modelling of a stand-alone electric power system has large applications today because of wind aggregates operating in isolated energy supply.
具有同步和异步发电机的独立电力系统
在同步发电机(SG)+异步发电机(AG)+负载(L)系统中,对于一定的负载值,有一个或三个工作点。在本文中,我们提出了工作点的正确评估,以期建立一个在平稳和过渡状态下都有效的发电机数学模型。独立电力系统的数值模拟和建模在今天有很大的应用,因为风聚集在孤立的能源供应中运行。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信