评估导致加纳设计和合同文件质量差的因素及其对项目实施的影响

Abu Fatawu, I. Adamu, M. Sidik, Moo Fortunatus
{"title":"评估导致加纳设计和合同文件质量差的因素及其对项目实施的影响","authors":"Abu Fatawu, I. Adamu, M. Sidik, Moo Fortunatus","doi":"10.7176/cer/12-7-08","DOIUrl":null,"url":null,"abstract":"Design and contract documentation processes which occur throughout the life cycle of the contract, is often mentioned an area that engenders contractual disputes in Ghana. This paper investigated the factors causing poor quality of design and contract documentation (DCD) and how this impact on successful project implementation in Ghana. It used questionnaire approach as the main method to obtain data which was analyzed using Relative Importance Index (RII) and Kendall’s concordance testing. Out of forty factors noted to contribute to DCD deficiencies, six were identified as critical: selection of designers on the basis of lowest price, unwillingness to pay fees commensurate with design services, last minute changes by clients, insufficient design reviews, inadequate clients’ briefs, slow payment systems and insufficient or missing input information from the client. To minimize or prevent DCD deficiencies in Ghana’s construction industry, the research recommends that briefs are adequate, clear and precise; consultancy fees are commensurate to the required service quality; consultants to ensure adequate review of design and contract documentation with all stakeholders and clients to select consultants based on merits. The measures suggested by the paper are believed to contribute to good quality contract documentation which can consequently improve project implementation in Ghana.","PeriodicalId":10219,"journal":{"name":"Civil and environmental research","volume":"42 3","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2020-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Assessing the Factors that Cause Poor Quality of Design and Contract Documentation and the Influence on Project Implementation in Ghana\",\"authors\":\"Abu Fatawu, I. Adamu, M. Sidik, Moo Fortunatus\",\"doi\":\"10.7176/cer/12-7-08\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Design and contract documentation processes which occur throughout the life cycle of the contract, is often mentioned an area that engenders contractual disputes in Ghana. This paper investigated the factors causing poor quality of design and contract documentation (DCD) and how this impact on successful project implementation in Ghana. It used questionnaire approach as the main method to obtain data which was analyzed using Relative Importance Index (RII) and Kendall’s concordance testing. Out of forty factors noted to contribute to DCD deficiencies, six were identified as critical: selection of designers on the basis of lowest price, unwillingness to pay fees commensurate with design services, last minute changes by clients, insufficient design reviews, inadequate clients’ briefs, slow payment systems and insufficient or missing input information from the client. To minimize or prevent DCD deficiencies in Ghana’s construction industry, the research recommends that briefs are adequate, clear and precise; consultancy fees are commensurate to the required service quality; consultants to ensure adequate review of design and contract documentation with all stakeholders and clients to select consultants based on merits. The measures suggested by the paper are believed to contribute to good quality contract documentation which can consequently improve project implementation in Ghana.\",\"PeriodicalId\":10219,\"journal\":{\"name\":\"Civil and environmental research\",\"volume\":\"42 3\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-07-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Civil and environmental research\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.7176/cer/12-7-08\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Civil and environmental research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.7176/cer/12-7-08","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

设计和合同文件编制过程贯穿于合同的整个生命周期,经常被提及是在加纳产生合同纠纷的一个领域。本文调查了导致设计和合同文件(DCD)质量差的因素,以及这对加纳成功项目实施的影响。采用问卷调查法获取数据,采用相对重要性指数(Relative Importance Index, RII)和肯德尔一致性检验对数据进行分析。在导致DCD缺陷的40个因素中,有6个被认为是关键因素:根据最低价格选择设计师,不愿意支付与设计服务相称的费用,客户最后一刻的更改,设计审查不足,客户简报不足,付款系统缓慢以及客户输入信息不足或缺失。为了尽量减少或防止加纳建筑业的DCD缺陷,研究建议简要说明应充分、清晰和准确;顾问费与所要求的服务质素相称;顾问确保与所有利益相关者和客户充分审查设计和合同文件,以根据优点选择顾问。据信,该文件建议的措施有助于编制高质量的合同文件,从而改善加纳的项目执行情况。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Assessing the Factors that Cause Poor Quality of Design and Contract Documentation and the Influence on Project Implementation in Ghana
Design and contract documentation processes which occur throughout the life cycle of the contract, is often mentioned an area that engenders contractual disputes in Ghana. This paper investigated the factors causing poor quality of design and contract documentation (DCD) and how this impact on successful project implementation in Ghana. It used questionnaire approach as the main method to obtain data which was analyzed using Relative Importance Index (RII) and Kendall’s concordance testing. Out of forty factors noted to contribute to DCD deficiencies, six were identified as critical: selection of designers on the basis of lowest price, unwillingness to pay fees commensurate with design services, last minute changes by clients, insufficient design reviews, inadequate clients’ briefs, slow payment systems and insufficient or missing input information from the client. To minimize or prevent DCD deficiencies in Ghana’s construction industry, the research recommends that briefs are adequate, clear and precise; consultancy fees are commensurate to the required service quality; consultants to ensure adequate review of design and contract documentation with all stakeholders and clients to select consultants based on merits. The measures suggested by the paper are believed to contribute to good quality contract documentation which can consequently improve project implementation in Ghana.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信