核电厂电气保护系统案例可靠性研究中BATAN 71号供电楼的短路分析

K. Handono, Tukiman, I. M. Putra, L. Subekti
{"title":"核电厂电气保护系统案例可靠性研究中BATAN 71号供电楼的短路分析","authors":"K. Handono, Tukiman, I. M. Putra, L. Subekti","doi":"10.1063/1.5135545","DOIUrl":null,"url":null,"abstract":"Short circuit analysis of electrical power supply building # 71 BATAN has been carried out. The electric power supply system in building # 71 consists of the main electrical power supply from PLN of 2500 kVa and an emergency power supply supplied from a diesel generator that supplies office lighting and a nuclear standard laboratory of 200 kVa. The purpose of this study is to study the emergency power supply protection system components as well as the normal short circuit current, because the power supply system in nuclear power plants has a high safety margin. The load that is loaded consists of a mixture load of either 3 phases or 1 phase in the amount of 50 kVA, and the lighting load is 36 kVA. From the analysis using ETAP software which consists of short phase to ground, between phases, showing the value of short circuit current flowing in each system and component, the current of short circuit is 64.6 kA the existing CB panel bus of the system is 80 kA, it means the safety margin is still far above that installed. This value is used to evaluate the rating of low power nuclear power supply protection systems between 3 MW to 10 MW, with 200 kVA emergency power supply.Short circuit analysis of electrical power supply building # 71 BATAN has been carried out. The electric power supply system in building # 71 consists of the main electrical power supply from PLN of 2500 kVa and an emergency power supply supplied from a diesel generator that supplies office lighting and a nuclear standard laboratory of 200 kVa. The purpose of this study is to study the emergency power supply protection system components as well as the normal short circuit current, because the power supply system in nuclear power plants has a high safety margin. The load that is loaded consists of a mixture load of either 3 phases or 1 phase in the amount of 50 kVA, and the lighting load is 36 kVA. From the analysis using ETAP software which consists of short phase to ground, between phases, showing the value of short circuit current flowing in each system and component, the current of short circuit is 64.6 kA the existing CB panel bus of the system is 80 kA, it means the safety margin is still far above t...","PeriodicalId":22239,"journal":{"name":"THE 4TH BIOMEDICAL ENGINEERING’S RECENT PROGRESS IN BIOMATERIALS, DRUGS DEVELOPMENT, HEALTH, AND MEDICAL DEVICES: Proceedings of the International Symposium of Biomedical Engineering (ISBE) 2019","volume":"8 5","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-12-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Short circuit analysis on electrical power supply building # 71 BATAN for case reliability study of nuclear power plant electrical protection system\",\"authors\":\"K. Handono, Tukiman, I. M. Putra, L. Subekti\",\"doi\":\"10.1063/1.5135545\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Short circuit analysis of electrical power supply building # 71 BATAN has been carried out. The electric power supply system in building # 71 consists of the main electrical power supply from PLN of 2500 kVa and an emergency power supply supplied from a diesel generator that supplies office lighting and a nuclear standard laboratory of 200 kVa. The purpose of this study is to study the emergency power supply protection system components as well as the normal short circuit current, because the power supply system in nuclear power plants has a high safety margin. The load that is loaded consists of a mixture load of either 3 phases or 1 phase in the amount of 50 kVA, and the lighting load is 36 kVA. From the analysis using ETAP software which consists of short phase to ground, between phases, showing the value of short circuit current flowing in each system and component, the current of short circuit is 64.6 kA the existing CB panel bus of the system is 80 kA, it means the safety margin is still far above that installed. This value is used to evaluate the rating of low power nuclear power supply protection systems between 3 MW to 10 MW, with 200 kVA emergency power supply.Short circuit analysis of electrical power supply building # 71 BATAN has been carried out. The electric power supply system in building # 71 consists of the main electrical power supply from PLN of 2500 kVa and an emergency power supply supplied from a diesel generator that supplies office lighting and a nuclear standard laboratory of 200 kVa. The purpose of this study is to study the emergency power supply protection system components as well as the normal short circuit current, because the power supply system in nuclear power plants has a high safety margin. The load that is loaded consists of a mixture load of either 3 phases or 1 phase in the amount of 50 kVA, and the lighting load is 36 kVA. From the analysis using ETAP software which consists of short phase to ground, between phases, showing the value of short circuit current flowing in each system and component, the current of short circuit is 64.6 kA the existing CB panel bus of the system is 80 kA, it means the safety margin is still far above t...\",\"PeriodicalId\":22239,\"journal\":{\"name\":\"THE 4TH BIOMEDICAL ENGINEERING’S RECENT PROGRESS IN BIOMATERIALS, DRUGS DEVELOPMENT, HEALTH, AND MEDICAL DEVICES: Proceedings of the International Symposium of Biomedical Engineering (ISBE) 2019\",\"volume\":\"8 5\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-12-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"THE 4TH BIOMEDICAL ENGINEERING’S RECENT PROGRESS IN BIOMATERIALS, DRUGS DEVELOPMENT, HEALTH, AND MEDICAL DEVICES: Proceedings of the International Symposium of Biomedical Engineering (ISBE) 2019\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1063/1.5135545\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"THE 4TH BIOMEDICAL ENGINEERING’S RECENT PROGRESS IN BIOMATERIALS, DRUGS DEVELOPMENT, HEALTH, AND MEDICAL DEVICES: Proceedings of the International Symposium of Biomedical Engineering (ISBE) 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1063/1.5135545","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

对巴丹71号供电楼进行了短路分析。71号楼的供电系统由PLN提供2500千伏安的主电源和柴油发电机提供的应急电源组成,柴油发电机提供办公室照明和200千伏安的核标准实验室。由于核电站供电系统具有较高的安全裕度,本研究的目的是研究应急供电保护系统的组成以及正常短路电流。所载负载由3相或1相的混载组成,量为50kva,照明负载为36kva。利用ETAP软件分析,由短相到地、相间组成,显示出各系统和各部件的短路电流值,短路电流为64.6 kA,系统现有CB板母线为80 kA,说明安全裕度仍远高于安装。该值用于评估3mw至10mw的小功率核电源保护系统的额定值,具有200kva应急电源。对巴丹71号供电楼进行了短路分析。71号楼的供电系统由PLN提供2500千伏安的主电源和柴油发电机提供的应急电源组成,柴油发电机提供办公室照明和200千伏安的核标准实验室。由于核电站供电系统具有较高的安全裕度,本研究的目的是研究应急供电保护系统的组成以及正常短路电流。所载负载由3相或1相的混载组成,量为50kva,照明负载为36kva。利用ETAP软件分析,由短相到地、相间组成,显示出各系统和各部件的短路电流值,短路电流为64.6 kA,系统现有CB板母线为80 kA,说明安全裕度仍远高于t。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Short circuit analysis on electrical power supply building # 71 BATAN for case reliability study of nuclear power plant electrical protection system
Short circuit analysis of electrical power supply building # 71 BATAN has been carried out. The electric power supply system in building # 71 consists of the main electrical power supply from PLN of 2500 kVa and an emergency power supply supplied from a diesel generator that supplies office lighting and a nuclear standard laboratory of 200 kVa. The purpose of this study is to study the emergency power supply protection system components as well as the normal short circuit current, because the power supply system in nuclear power plants has a high safety margin. The load that is loaded consists of a mixture load of either 3 phases or 1 phase in the amount of 50 kVA, and the lighting load is 36 kVA. From the analysis using ETAP software which consists of short phase to ground, between phases, showing the value of short circuit current flowing in each system and component, the current of short circuit is 64.6 kA the existing CB panel bus of the system is 80 kA, it means the safety margin is still far above that installed. This value is used to evaluate the rating of low power nuclear power supply protection systems between 3 MW to 10 MW, with 200 kVA emergency power supply.Short circuit analysis of electrical power supply building # 71 BATAN has been carried out. The electric power supply system in building # 71 consists of the main electrical power supply from PLN of 2500 kVa and an emergency power supply supplied from a diesel generator that supplies office lighting and a nuclear standard laboratory of 200 kVa. The purpose of this study is to study the emergency power supply protection system components as well as the normal short circuit current, because the power supply system in nuclear power plants has a high safety margin. The load that is loaded consists of a mixture load of either 3 phases or 1 phase in the amount of 50 kVA, and the lighting load is 36 kVA. From the analysis using ETAP software which consists of short phase to ground, between phases, showing the value of short circuit current flowing in each system and component, the current of short circuit is 64.6 kA the existing CB panel bus of the system is 80 kA, it means the safety margin is still far above t...
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信