XYZ矿场羊角面包产量分析及缓解策略

Maria Theresa Meishichita, I. Satriawan, Cokorda Anom Bayu Sadyasmara
{"title":"XYZ矿场羊角面包产量分析及缓解策略","authors":"Maria Theresa Meishichita, I. Satriawan, Cokorda Anom Bayu Sadyasmara","doi":"10.47191/rajar/v9i1.04","DOIUrl":null,"url":null,"abstract":"This purpose of this research is to identify risk, analyzes risk priorities, and formulate alternative strategies and determine the priority strategies that can be applied to minimize the risk in production process of croissant at PT XYZ. The methods used in this research were the Failure Mode and Effect Analysis (FMEA) method and Analytical Hierarchy Process (AHP). The FMEA method is used to asses and determine risk priorities, while the AHP method is used to determine the priority of risk mitigation strategies. Based on the result, there are 19 risks which are divided into 3 risk factors, namely: raw materials, production process, and deliveries. The result from risk assessment and determination of risk priorities were the risk that have a high-Risk Priority Number (RPN), namely the risk of damage to raw materials during storage in the warehouse (52.6), machines and equipment are not working optimally (292.3), and delivery vehicles have problems (73.1). Priority strategies that can be used to minimize risk, namely on raw material risk factors are to make improvements to the placement and separation of clear types of raw materials (0.384), while in the production process risk factor are to replace machines and equipment that have a long life (0.435), and in delivery risk factor is to improve performance control and maintenance of vehicles on a regular basis (0.610).","PeriodicalId":20848,"journal":{"name":"RA JOURNAL OF APPLIED RESEARCH","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-01-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analysis and Mitigation Strategies of Croissant Production at PT XYZ\",\"authors\":\"Maria Theresa Meishichita, I. Satriawan, Cokorda Anom Bayu Sadyasmara\",\"doi\":\"10.47191/rajar/v9i1.04\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This purpose of this research is to identify risk, analyzes risk priorities, and formulate alternative strategies and determine the priority strategies that can be applied to minimize the risk in production process of croissant at PT XYZ. The methods used in this research were the Failure Mode and Effect Analysis (FMEA) method and Analytical Hierarchy Process (AHP). The FMEA method is used to asses and determine risk priorities, while the AHP method is used to determine the priority of risk mitigation strategies. Based on the result, there are 19 risks which are divided into 3 risk factors, namely: raw materials, production process, and deliveries. The result from risk assessment and determination of risk priorities were the risk that have a high-Risk Priority Number (RPN), namely the risk of damage to raw materials during storage in the warehouse (52.6), machines and equipment are not working optimally (292.3), and delivery vehicles have problems (73.1). Priority strategies that can be used to minimize risk, namely on raw material risk factors are to make improvements to the placement and separation of clear types of raw materials (0.384), while in the production process risk factor are to replace machines and equipment that have a long life (0.435), and in delivery risk factor is to improve performance control and maintenance of vehicles on a regular basis (0.610).\",\"PeriodicalId\":20848,\"journal\":{\"name\":\"RA JOURNAL OF APPLIED RESEARCH\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-01-23\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"RA JOURNAL OF APPLIED RESEARCH\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.47191/rajar/v9i1.04\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"RA JOURNAL OF APPLIED RESEARCH","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.47191/rajar/v9i1.04","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本研究的目的是识别风险,分析风险优先级,并制定备选策略,确定优先级策略,以最大限度地降低PT XYZ牛角面包生产过程中的风险。本研究采用了失效模式与影响分析法(FMEA)和层次分析法(AHP)。FMEA方法用于评估和确定风险优先级,AHP方法用于确定风险缓解策略的优先级。根据结果,共有19个风险,分为3个风险因素,分别是:原材料,生产过程,交货。风险评估和确定风险优先级的结果是具有高风险优先级编号(RPN)的风险,即在仓库储存期间原材料损坏的风险(52.6),机器和设备不能最佳工作的风险(292.3),以及运输车辆有问题的风险(73.1)。降低风险的优先策略,即在原材料风险因素上,改进明确类型的原材料的放置和分离(0.384);在生产过程风险因素上,更换长寿命的机器和设备(0.435);在交货风险因素上,改进车辆的性能控制和定期维修(0.610)。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Analysis and Mitigation Strategies of Croissant Production at PT XYZ
This purpose of this research is to identify risk, analyzes risk priorities, and formulate alternative strategies and determine the priority strategies that can be applied to minimize the risk in production process of croissant at PT XYZ. The methods used in this research were the Failure Mode and Effect Analysis (FMEA) method and Analytical Hierarchy Process (AHP). The FMEA method is used to asses and determine risk priorities, while the AHP method is used to determine the priority of risk mitigation strategies. Based on the result, there are 19 risks which are divided into 3 risk factors, namely: raw materials, production process, and deliveries. The result from risk assessment and determination of risk priorities were the risk that have a high-Risk Priority Number (RPN), namely the risk of damage to raw materials during storage in the warehouse (52.6), machines and equipment are not working optimally (292.3), and delivery vehicles have problems (73.1). Priority strategies that can be used to minimize risk, namely on raw material risk factors are to make improvements to the placement and separation of clear types of raw materials (0.384), while in the production process risk factor are to replace machines and equipment that have a long life (0.435), and in delivery risk factor is to improve performance control and maintenance of vehicles on a regular basis (0.610).
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信