评价你在2020年对六国工业监督的实施

Ridwan Muchtar, B. D. Leonanda
{"title":"评价你在2020年对六国工业监督的实施","authors":"Ridwan Muchtar, B. D. Leonanda","doi":"10.30630/jtm.15.1.799","DOIUrl":null,"url":null,"abstract":"Overhaul activity is one periodic maintenance by the company to recondition production equipment in order tooperate with high avaibility and realibility. Overhaul activities can also be referred to as project based on a series of work that occirs unique, complex, done in a certain period of time and resources. This factory overhaul project must be completed on time, according to quality and cost as well as zero accident. In connection with the condition of the Covid-19 pandemic, the work is carried out with the Covid-19 health protocol so that ts doesnot become a source of new spread. In this paper will be discussed the implementation of the overhaul of theplant Indarung VI Year 2020 in the pandemic, starting from the stages of planning, preparation, implementation and evaluation (feedback). The realization of work time experienced delays of 2,68 days, quality according to standards and with the realization of a greater cost of Rp. 2.22 Billion. During the overhaul project there were 3 cases of work accidents and there were no additional cases of Covid-19 in the workforce involved in the project.","PeriodicalId":31956,"journal":{"name":"Jurnal Teknik Mesin","volume":"33 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-07-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Evaluasi Pelaksanaan Overhaul Pabrik Indarung VI Pada Masa Pandemu di Tahun 2020\",\"authors\":\"Ridwan Muchtar, B. D. Leonanda\",\"doi\":\"10.30630/jtm.15.1.799\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Overhaul activity is one periodic maintenance by the company to recondition production equipment in order tooperate with high avaibility and realibility. Overhaul activities can also be referred to as project based on a series of work that occirs unique, complex, done in a certain period of time and resources. This factory overhaul project must be completed on time, according to quality and cost as well as zero accident. In connection with the condition of the Covid-19 pandemic, the work is carried out with the Covid-19 health protocol so that ts doesnot become a source of new spread. In this paper will be discussed the implementation of the overhaul of theplant Indarung VI Year 2020 in the pandemic, starting from the stages of planning, preparation, implementation and evaluation (feedback). The realization of work time experienced delays of 2,68 days, quality according to standards and with the realization of a greater cost of Rp. 2.22 Billion. During the overhaul project there were 3 cases of work accidents and there were no additional cases of Covid-19 in the workforce involved in the project.\",\"PeriodicalId\":31956,\"journal\":{\"name\":\"Jurnal Teknik Mesin\",\"volume\":\"33 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-07-08\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Teknik Mesin\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.30630/jtm.15.1.799\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Teknik Mesin","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30630/jtm.15.1.799","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

大修活动是公司对生产设备进行定期维修,以使其具有高可用性和可靠性。大修活动也可以称为基于一系列独特的、复杂的、在一定时间和资源范围内完成的工作的项目。本次工厂大修项目必须按时、按质量、按成本、零事故完成。结合2019冠状病毒病大流行的情况,这项工作是根据2019冠状病毒病卫生方案开展的,以防止其成为新的传播来源。本文将从规划、准备、实施和评估(反馈)等阶段,讨论2020年大修工厂实施情况。实现工作时间经历了2,68天的延迟,质量符合标准,并实现了22.2亿卢比的更大成本。在大修项目期间,发生了3起工作事故,参与项目的劳动力中没有新增Covid-19病例。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Evaluasi Pelaksanaan Overhaul Pabrik Indarung VI Pada Masa Pandemu di Tahun 2020
Overhaul activity is one periodic maintenance by the company to recondition production equipment in order tooperate with high avaibility and realibility. Overhaul activities can also be referred to as project based on a series of work that occirs unique, complex, done in a certain period of time and resources. This factory overhaul project must be completed on time, according to quality and cost as well as zero accident. In connection with the condition of the Covid-19 pandemic, the work is carried out with the Covid-19 health protocol so that ts doesnot become a source of new spread. In this paper will be discussed the implementation of the overhaul of theplant Indarung VI Year 2020 in the pandemic, starting from the stages of planning, preparation, implementation and evaluation (feedback). The realization of work time experienced delays of 2,68 days, quality according to standards and with the realization of a greater cost of Rp. 2.22 Billion. During the overhaul project there were 3 cases of work accidents and there were no additional cases of Covid-19 in the workforce involved in the project.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
审稿时长
18 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信