监测测量在公路隧道动态反馈设计与病害管理中的应用

H. Pan, Xiaoyu Cao, Linde Yang
{"title":"监测测量在公路隧道动态反馈设计与病害管理中的应用","authors":"H. Pan, Xiaoyu Cao, Linde Yang","doi":"10.1109/ICEEE.2010.5661388","DOIUrl":null,"url":null,"abstract":"Monitoring sections were set up to track and monitor whole course for the lining wall cracks, slope sliding, tunnel deformation, twisted steel and other serious diseases in Sanggongjing-tunnel. Based on the analysis of monitoring data, the method of dynamic-feedback-design and information construction was developed to adjust and modify the design and construction program timely, and the means of back-analysis was used to calculate the internal forces of lining structures according to monitoring data. The causes for diseases were analyzed combined with all monitoring information varying with time, then, the governance measures which made it a principle to stabilize the slope and the reinforce lining at the same time were determined ultimately the principle.","PeriodicalId":6302,"journal":{"name":"2010 International Conference on E-Product E-Service and E-Entertainment","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2010-12-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"The Application of Monitoring and Measurement to Dynamic-Feedback-Design and Disease Management in Highway Tunnel\",\"authors\":\"H. Pan, Xiaoyu Cao, Linde Yang\",\"doi\":\"10.1109/ICEEE.2010.5661388\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Monitoring sections were set up to track and monitor whole course for the lining wall cracks, slope sliding, tunnel deformation, twisted steel and other serious diseases in Sanggongjing-tunnel. Based on the analysis of monitoring data, the method of dynamic-feedback-design and information construction was developed to adjust and modify the design and construction program timely, and the means of back-analysis was used to calculate the internal forces of lining structures according to monitoring data. The causes for diseases were analyzed combined with all monitoring information varying with time, then, the governance measures which made it a principle to stabilize the slope and the reinforce lining at the same time were determined ultimately the principle.\",\"PeriodicalId\":6302,\"journal\":{\"name\":\"2010 International Conference on E-Product E-Service and E-Entertainment\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-12-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2010 International Conference on E-Product E-Service and E-Entertainment\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICEEE.2010.5661388\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 International Conference on E-Product E-Service and E-Entertainment","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICEEE.2010.5661388","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

设置监测断面,对桑公井隧道衬砌裂缝、边坡滑移、隧道变形、扭钢等重大病害进行全程跟踪监测。在对监测数据进行分析的基础上,提出了动态反馈设计和信息化施工的方法,及时调整和修改设计和施工方案,并采用反分析的方法,根据监测数据计算衬砌结构内力。结合各种随时间变化的监测信息,分析病害发生的原因,最终确定以稳定边坡和加固衬砌同时进行为原则的治理措施。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The Application of Monitoring and Measurement to Dynamic-Feedback-Design and Disease Management in Highway Tunnel
Monitoring sections were set up to track and monitor whole course for the lining wall cracks, slope sliding, tunnel deformation, twisted steel and other serious diseases in Sanggongjing-tunnel. Based on the analysis of monitoring data, the method of dynamic-feedback-design and information construction was developed to adjust and modify the design and construction program timely, and the means of back-analysis was used to calculate the internal forces of lining structures according to monitoring data. The causes for diseases were analyzed combined with all monitoring information varying with time, then, the governance measures which made it a principle to stabilize the slope and the reinforce lining at the same time were determined ultimately the principle.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信