基于莫斯科优先级的个人极限编程开发图书馆信息系统

Gita Indah Marthasari, Wildan Suharso, Frendy Ardiansyah Ardiansyah
{"title":"基于莫斯科优先级的个人极限编程开发图书馆信息系统","authors":"Gita Indah Marthasari, Wildan Suharso, Frendy Ardiansyah Ardiansyah","doi":"10.11591/EECSI.V5I5.1701","DOIUrl":null,"url":null,"abstract":"Software development projects require experience and knowledge of the developer or clients related to the system which will be developed. Unclear clients' needs potentially emerge many changes of needs during the process of development which can not be resolved by using conventional software development methodology. The implementation on the less significant requirements either from the clients or the system cause the development of the project took a long time. In this paper, we combine personal extreme programming (PXP) methodology with Moscow technique to overcome those problems. PXP is suitable to use in small to medium-sized projects if the clients do not know in detail about the needs in the development of application, application needed in relatively quick time, and the development phase is adjusted to use by a single programmer. Moscow technique was used for prioritizing requirements elicited in PXP methodology. Moscow is a method to determine priority needs based on cost, risk, and business value. This technique was applied during the planning phase of PXP to develop library application, thereby it reduced the time of project completion. The result was a library application suited the needs of clients to support business processes at Batu State Attorney's library.","PeriodicalId":20498,"journal":{"name":"Proceeding of the Electrical Engineering Computer Science and Informatics","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2018-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"Personal Extreme Programming with MoSCoW Prioritization for Developing Library Information System\",\"authors\":\"Gita Indah Marthasari, Wildan Suharso, Frendy Ardiansyah Ardiansyah\",\"doi\":\"10.11591/EECSI.V5I5.1701\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Software development projects require experience and knowledge of the developer or clients related to the system which will be developed. Unclear clients' needs potentially emerge many changes of needs during the process of development which can not be resolved by using conventional software development methodology. The implementation on the less significant requirements either from the clients or the system cause the development of the project took a long time. In this paper, we combine personal extreme programming (PXP) methodology with Moscow technique to overcome those problems. PXP is suitable to use in small to medium-sized projects if the clients do not know in detail about the needs in the development of application, application needed in relatively quick time, and the development phase is adjusted to use by a single programmer. Moscow technique was used for prioritizing requirements elicited in PXP methodology. Moscow is a method to determine priority needs based on cost, risk, and business value. This technique was applied during the planning phase of PXP to develop library application, thereby it reduced the time of project completion. The result was a library application suited the needs of clients to support business processes at Batu State Attorney's library.\",\"PeriodicalId\":20498,\"journal\":{\"name\":\"Proceeding of the Electrical Engineering Computer Science and Informatics\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceeding of the Electrical Engineering Computer Science and Informatics\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.11591/EECSI.V5I5.1701\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceeding of the Electrical Engineering Computer Science and Informatics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.11591/EECSI.V5I5.1701","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

摘要

软件开发项目需要与将要开发的系统相关的开发人员或客户的经验和知识。不明确的客户需求可能会在开发过程中产生许多需求变化,这些变化是传统软件开发方法无法解决的。对来自客户或系统的次要需求的实现导致项目的开发花费了很长时间。在本文中,我们将个人极限编程(PXP)方法与莫斯科技术相结合来克服这些问题。如果客户对应用程序开发中的需求不太了解,应用程序需要的时间比较快,并且开发阶段调整为由单个程序员使用,则PXP适用于中小型项目。莫斯科技术用于对PXP方法中引出的需求进行优先排序。Moscow是一种基于成本、风险和业务价值确定优先级需求的方法。该技术在PXP的计划阶段应用于库应用程序的开发,从而缩短了项目完成的时间。结果是一个适合客户需求的图书馆应用程序,以支持Batu州检察官图书馆的业务流程。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Personal Extreme Programming with MoSCoW Prioritization for Developing Library Information System
Software development projects require experience and knowledge of the developer or clients related to the system which will be developed. Unclear clients' needs potentially emerge many changes of needs during the process of development which can not be resolved by using conventional software development methodology. The implementation on the less significant requirements either from the clients or the system cause the development of the project took a long time. In this paper, we combine personal extreme programming (PXP) methodology with Moscow technique to overcome those problems. PXP is suitable to use in small to medium-sized projects if the clients do not know in detail about the needs in the development of application, application needed in relatively quick time, and the development phase is adjusted to use by a single programmer. Moscow technique was used for prioritizing requirements elicited in PXP methodology. Moscow is a method to determine priority needs based on cost, risk, and business value. This technique was applied during the planning phase of PXP to develop library application, thereby it reduced the time of project completion. The result was a library application suited the needs of clients to support business processes at Batu State Attorney's library.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信