随机交货期下多级装配系统的遗传算法

O. Ammar, A. Dolgui, Hélène Marian
{"title":"随机交货期下多级装配系统的遗传算法","authors":"O. Ammar, A. Dolgui, Hélène Marian","doi":"10.3182/20140824-6-ZA-1003.01522","DOIUrl":null,"url":null,"abstract":"The aim of this paper is to propose models to adapt and parameterize the Material Requirement Planning (MRP) approach under lead time uncertainty. Multi-level assembly systems with one type of finished products and several types of components aer studied. Each component has a fixed unit inventory cost and the finished product has a backlogging cost per unit of time. The lead times of components are discrete random variables, and the costumer’s demand of the finished product is known. A general mathematical model for supply planning of multi-level assembly systems is presented. A Genetic Algorithm (GA) method is proposed to minimize the sum of the average inventory holding cost for components and the average backlogging and inventory holding costs for the finished product.","PeriodicalId":13260,"journal":{"name":"IFAC Proceedings Volumes","volume":"42 1","pages":"778-783"},"PeriodicalIF":0.0000,"publicationDate":"2014-08-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Genetic algorithm for multi-level assembly systems under stochastic lead times\",\"authors\":\"O. Ammar, A. Dolgui, Hélène Marian\",\"doi\":\"10.3182/20140824-6-ZA-1003.01522\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The aim of this paper is to propose models to adapt and parameterize the Material Requirement Planning (MRP) approach under lead time uncertainty. Multi-level assembly systems with one type of finished products and several types of components aer studied. Each component has a fixed unit inventory cost and the finished product has a backlogging cost per unit of time. The lead times of components are discrete random variables, and the costumer’s demand of the finished product is known. A general mathematical model for supply planning of multi-level assembly systems is presented. A Genetic Algorithm (GA) method is proposed to minimize the sum of the average inventory holding cost for components and the average backlogging and inventory holding costs for the finished product.\",\"PeriodicalId\":13260,\"journal\":{\"name\":\"IFAC Proceedings Volumes\",\"volume\":\"42 1\",\"pages\":\"778-783\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-08-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IFAC Proceedings Volumes\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.3182/20140824-6-ZA-1003.01522\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IFAC Proceedings Volumes","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3182/20140824-6-ZA-1003.01522","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

本文的目的是提出在交货期不确定的情况下,物料需求计划(MRP)方法的参数化模型。研究了一种成品和几种零件的多级装配系统。每个组件都有固定的单位库存成本,而成品则有单位时间的积压成本。零件的交货期是离散的随机变量,客户对成品的需求是已知的。提出了多级装配系统供应规划的通用数学模型。提出了一种遗传算法,使零件平均库存持有成本与成品平均积压成本和库存持有成本之和最小。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Genetic algorithm for multi-level assembly systems under stochastic lead times
The aim of this paper is to propose models to adapt and parameterize the Material Requirement Planning (MRP) approach under lead time uncertainty. Multi-level assembly systems with one type of finished products and several types of components aer studied. Each component has a fixed unit inventory cost and the finished product has a backlogging cost per unit of time. The lead times of components are discrete random variables, and the costumer’s demand of the finished product is known. A general mathematical model for supply planning of multi-level assembly systems is presented. A Genetic Algorithm (GA) method is proposed to minimize the sum of the average inventory holding cost for components and the average backlogging and inventory holding costs for the finished product.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信