{"title":"基于可靠性维护和作业调度的双层模型","authors":"R. Jamshidi","doi":"10.5829/ije.2018.31.03c.05","DOIUrl":null,"url":null,"abstract":"Many defects in manufacturing system are caused by human resources that show the significance of the human resources in manufacturing systems. Most manufacturers attempt to investigate the human resources in order to improve the work conditions and reduce the human error by providing a proper work-rest schedule. On the other hand, manufacturer deal with machine scheduling based on demand and work type. The mentioned scheduling would be effective if both are simultaneously implemented; then, we confront integrated human- machine systems which work with minimum cost, machine failure and human errors. Considering this fact, we propose a bi-level mixed integer nonlinear model to minimize the machine scheduling costs such as earliness-tardiness cost and interruption cost in the upper level and human error in lower level according to performance shaping factors (PSFs). Several numerical instances are implemented by the proposed model to show the model effectiveness to obtain the best work schedule for human resources and machines in manufacturing systems.","PeriodicalId":14066,"journal":{"name":"International Journal of Engineering - Transactions C: Aspects","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2017-10-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Bi-level Model for Reliability based Maintenance and Job Scheduling\",\"authors\":\"R. Jamshidi\",\"doi\":\"10.5829/ije.2018.31.03c.05\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Many defects in manufacturing system are caused by human resources that show the significance of the human resources in manufacturing systems. Most manufacturers attempt to investigate the human resources in order to improve the work conditions and reduce the human error by providing a proper work-rest schedule. On the other hand, manufacturer deal with machine scheduling based on demand and work type. The mentioned scheduling would be effective if both are simultaneously implemented; then, we confront integrated human- machine systems which work with minimum cost, machine failure and human errors. Considering this fact, we propose a bi-level mixed integer nonlinear model to minimize the machine scheduling costs such as earliness-tardiness cost and interruption cost in the upper level and human error in lower level according to performance shaping factors (PSFs). Several numerical instances are implemented by the proposed model to show the model effectiveness to obtain the best work schedule for human resources and machines in manufacturing systems.\",\"PeriodicalId\":14066,\"journal\":{\"name\":\"International Journal of Engineering - Transactions C: Aspects\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-10-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Engineering - Transactions C: Aspects\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5829/ije.2018.31.03c.05\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Engineering - Transactions C: Aspects","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5829/ije.2018.31.03c.05","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 2

摘要

制造系统的许多缺陷都是由人力资源引起的,这说明了人力资源在制造系统中的重要性。大多数制造商试图调查人力资源,以改善工作条件,并通过提供适当的工作-休息时间表减少人为错误。另一方面,制造商根据需求和工作类型来处理机器调度。如果两者同时执行,上述调度将是有效的;然后,我们面对集成的人机系统,以最低的成本,机器故障和人为错误的工作。考虑到这一事实,我们提出了一种双层混合整数非线性模型,以最大限度地减少机器调度成本,即上层的早迟到成本和中断成本,下层的人为误差。通过数值算例验证了该模型对制造系统中人力资源和机器最优工作调度的有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Bi-level Model for Reliability based Maintenance and Job Scheduling
Many defects in manufacturing system are caused by human resources that show the significance of the human resources in manufacturing systems. Most manufacturers attempt to investigate the human resources in order to improve the work conditions and reduce the human error by providing a proper work-rest schedule. On the other hand, manufacturer deal with machine scheduling based on demand and work type. The mentioned scheduling would be effective if both are simultaneously implemented; then, we confront integrated human- machine systems which work with minimum cost, machine failure and human errors. Considering this fact, we propose a bi-level mixed integer nonlinear model to minimize the machine scheduling costs such as earliness-tardiness cost and interruption cost in the upper level and human error in lower level according to performance shaping factors (PSFs). Several numerical instances are implemented by the proposed model to show the model effectiveness to obtain the best work schedule for human resources and machines in manufacturing systems.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
3.10
自引率
0.00%
发文量
29
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信