M. Basioni, Abu Baker Ali Al Jefri, A. Y. Al Blooshi, Hamda J. AlMesmari, Y. Azoug, N. Belova, K. Bogachev, Aleksei Grishin, A. Elmahdi, F. Roncarolo
{"title":"深层气藏综合资产建模。阿联酋个案研究","authors":"M. Basioni, Abu Baker Ali Al Jefri, A. Y. Al Blooshi, Hamda J. AlMesmari, Y. Azoug, N. Belova, K. Bogachev, Aleksei Grishin, A. Elmahdi, F. Roncarolo","doi":"10.2118/207660-ms","DOIUrl":null,"url":null,"abstract":"\n The primary objective of reservoir management is the maximization of plateau duration and reserves recovery, while minimizing the project risks and maintaining the highest environmental and safety standards. It is critical to identify upfront all the risks and bottlenecks that may occur through the entire life of the assets, to prevent them from happening or minimize the reaction time in case of occurrence. Integration of all asset elements (subsurface dynamic models and a surface facility network) provides a fit-for-purpose tool to optimize assets development. This article describes fully coupled surface and subsurface modeling done for 6 reservoir formations (3 fields) sharing the surface facility and including 6 gas reservoirs with different PVT properties. A fully integrated model describes all technical processes occurring in the subsurface and surface systems and has to be further calibrated using measurements done as per the reservoir monitoring plan.","PeriodicalId":11069,"journal":{"name":"Day 2 Tue, November 16, 2021","volume":"112 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-12-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Integrated Asset Modeling for Deep Gas Reservoirs. Case Study in UAE\",\"authors\":\"M. Basioni, Abu Baker Ali Al Jefri, A. Y. Al Blooshi, Hamda J. AlMesmari, Y. Azoug, N. Belova, K. Bogachev, Aleksei Grishin, A. Elmahdi, F. Roncarolo\",\"doi\":\"10.2118/207660-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n The primary objective of reservoir management is the maximization of plateau duration and reserves recovery, while minimizing the project risks and maintaining the highest environmental and safety standards. It is critical to identify upfront all the risks and bottlenecks that may occur through the entire life of the assets, to prevent them from happening or minimize the reaction time in case of occurrence. Integration of all asset elements (subsurface dynamic models and a surface facility network) provides a fit-for-purpose tool to optimize assets development. This article describes fully coupled surface and subsurface modeling done for 6 reservoir formations (3 fields) sharing the surface facility and including 6 gas reservoirs with different PVT properties. A fully integrated model describes all technical processes occurring in the subsurface and surface systems and has to be further calibrated using measurements done as per the reservoir monitoring plan.\",\"PeriodicalId\":11069,\"journal\":{\"name\":\"Day 2 Tue, November 16, 2021\",\"volume\":\"112 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-12-09\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 2 Tue, November 16, 2021\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/207660-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Tue, November 16, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/207660-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Integrated Asset Modeling for Deep Gas Reservoirs. Case Study in UAE
The primary objective of reservoir management is the maximization of plateau duration and reserves recovery, while minimizing the project risks and maintaining the highest environmental and safety standards. It is critical to identify upfront all the risks and bottlenecks that may occur through the entire life of the assets, to prevent them from happening or minimize the reaction time in case of occurrence. Integration of all asset elements (subsurface dynamic models and a surface facility network) provides a fit-for-purpose tool to optimize assets development. This article describes fully coupled surface and subsurface modeling done for 6 reservoir formations (3 fields) sharing the surface facility and including 6 gas reservoirs with different PVT properties. A fully integrated model describes all technical processes occurring in the subsurface and surface systems and has to be further calibrated using measurements done as per the reservoir monitoring plan.