{"title":"块状崩落矿长期生产调度优化及三维混料分析","authors":"F. Khodayari, Y. Pourrahimian","doi":"10.1080/25726668.2018.1563742","DOIUrl":null,"url":null,"abstract":"ABSTRACT Although some scheduling optimization models can be found in the literature, few of them include material flow and the resulting dilution. In this paper, a 3D mixing methodology is proposed to be incorporated into the production schedule model. To capture horizontal and vertical mixing, different scenarios are generated based on the particles that fall into a 3D cone of movement, CoM. The proposed model is a block caving scheduling optimizer, BCSO, which includes mixing in the optimization. The BCSO was tested on a real-case block caving mine with 424 drawpoints; also, a number of production schedules were generated for the same mine using PCBC GEOVIA software. Resulting production schedules show that the BCSO can improve the NPV of the project by 2% to 4% compared to the best case generated by PCBC.","PeriodicalId":44166,"journal":{"name":"Mining Technology-Transactions of the Institutions of Mining and Metallurgy","volume":null,"pages":null},"PeriodicalIF":1.8000,"publicationDate":"2019-01-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":"{\"title\":\"Long-term production scheduling optimization and 3D material mixing analysis for block caving mines\",\"authors\":\"F. Khodayari, Y. Pourrahimian\",\"doi\":\"10.1080/25726668.2018.1563742\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"ABSTRACT Although some scheduling optimization models can be found in the literature, few of them include material flow and the resulting dilution. In this paper, a 3D mixing methodology is proposed to be incorporated into the production schedule model. To capture horizontal and vertical mixing, different scenarios are generated based on the particles that fall into a 3D cone of movement, CoM. The proposed model is a block caving scheduling optimizer, BCSO, which includes mixing in the optimization. The BCSO was tested on a real-case block caving mine with 424 drawpoints; also, a number of production schedules were generated for the same mine using PCBC GEOVIA software. Resulting production schedules show that the BCSO can improve the NPV of the project by 2% to 4% compared to the best case generated by PCBC.\",\"PeriodicalId\":44166,\"journal\":{\"name\":\"Mining Technology-Transactions of the Institutions of Mining and Metallurgy\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.8000,\"publicationDate\":\"2019-01-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"7\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Mining Technology-Transactions of the Institutions of Mining and Metallurgy\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1080/25726668.2018.1563742\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"MINING & MINERAL PROCESSING\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Mining Technology-Transactions of the Institutions of Mining and Metallurgy","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/25726668.2018.1563742","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MINING & MINERAL PROCESSING","Score":null,"Total":0}
Long-term production scheduling optimization and 3D material mixing analysis for block caving mines
ABSTRACT Although some scheduling optimization models can be found in the literature, few of them include material flow and the resulting dilution. In this paper, a 3D mixing methodology is proposed to be incorporated into the production schedule model. To capture horizontal and vertical mixing, different scenarios are generated based on the particles that fall into a 3D cone of movement, CoM. The proposed model is a block caving scheduling optimizer, BCSO, which includes mixing in the optimization. The BCSO was tested on a real-case block caving mine with 424 drawpoints; also, a number of production schedules were generated for the same mine using PCBC GEOVIA software. Resulting production schedules show that the BCSO can improve the NPV of the project by 2% to 4% compared to the best case generated by PCBC.