{"title":"造船业的转型:从项目生产到批量生产。它对波浪能农场的LCOE有什么影响?","authors":"L. Castro-Santos, P. Rubial-Yáñez, I. Lamas-Galdo, D. Cordal Iglesias, A. Alcayde, F. G. Montoya, A. Filgueira-Vizoso","doi":"10.24084/repqj21.214","DOIUrl":null,"url":null,"abstract":"The objective of this work has been to analyze the variation of different economic parameters (Levelized Cost Of Energy and Internal Rate of Return) for two possible ways of manufacturing: production by project to mass production. For this, 6 possible scenarios have been considered, taking into account the number of equipment manufactured and the economic parameters have been calculated in order to know which alternative provides greater economic viability, thus making the project more profitable.","PeriodicalId":21076,"journal":{"name":"Renewable Energy and Power Quality Journal","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Reconversion of the shipbuilding sector: from production by project to mass production. What is its effect on the LCOE of a wave energy farm?\",\"authors\":\"L. Castro-Santos, P. Rubial-Yáñez, I. Lamas-Galdo, D. Cordal Iglesias, A. Alcayde, F. G. Montoya, A. Filgueira-Vizoso\",\"doi\":\"10.24084/repqj21.214\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The objective of this work has been to analyze the variation of different economic parameters (Levelized Cost Of Energy and Internal Rate of Return) for two possible ways of manufacturing: production by project to mass production. For this, 6 possible scenarios have been considered, taking into account the number of equipment manufactured and the economic parameters have been calculated in order to know which alternative provides greater economic viability, thus making the project more profitable.\",\"PeriodicalId\":21076,\"journal\":{\"name\":\"Renewable Energy and Power Quality Journal\",\"volume\":\"1 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-07-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Renewable Energy and Power Quality Journal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.24084/repqj21.214\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"Energy\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Renewable Energy and Power Quality Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24084/repqj21.214","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Energy","Score":null,"Total":0}
Reconversion of the shipbuilding sector: from production by project to mass production. What is its effect on the LCOE of a wave energy farm?
The objective of this work has been to analyze the variation of different economic parameters (Levelized Cost Of Energy and Internal Rate of Return) for two possible ways of manufacturing: production by project to mass production. For this, 6 possible scenarios have been considered, taking into account the number of equipment manufactured and the economic parameters have been calculated in order to know which alternative provides greater economic viability, thus making the project more profitable.