{"title":"钢厂的短期(1-15个月)规划和控制","authors":"Jorma Kuutti,&nbsp;Ovako Oy","doi":"10.1016/0377-841X(79)90035-4","DOIUrl":null,"url":null,"abstract":"<div><p>Cyclic, stepvise, on customer orders based production is a normal practice in steel plants. This, however, causes many problems to all planning horizons. In this paper a hierarchic short term planning and control system of a special steel plant is introduced. Corporate planning hierarchy is also described in short.</p></div>","PeriodicalId":100475,"journal":{"name":"Engineering and Process Economics","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"1979-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0377-841X(79)90035-4","citationCount":"1","resultStr":"{\"title\":\"The short term (1–15 months) planning and control of a steel plant\",\"authors\":\"Jorma Kuutti,&nbsp;Ovako Oy\",\"doi\":\"10.1016/0377-841X(79)90035-4\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>Cyclic, stepvise, on customer orders based production is a normal practice in steel plants. This, however, causes many problems to all planning horizons. In this paper a hierarchic short term planning and control system of a special steel plant is introduced. Corporate planning hierarchy is also described in short.</p></div>\",\"PeriodicalId\":100475,\"journal\":{\"name\":\"Engineering and Process Economics\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1979-06-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1016/0377-841X(79)90035-4\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Engineering and Process Economics\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/0377841X79900354\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering and Process Economics","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/0377841X79900354","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

以客户订单为基础的循环、阶梯式生产是钢铁厂的一种正常做法。然而,这给所有规划范围带来了许多问题。本文介绍了某特钢工厂的分级短期规划与控制系统。本文还简要描述了企业规划层次结构。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The short term (1–15 months) planning and control of a steel plant

Cyclic, stepvise, on customer orders based production is a normal practice in steel plants. This, however, causes many problems to all planning horizons. In this paper a hierarchic short term planning and control system of a special steel plant is introduced. Corporate planning hierarchy is also described in short.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信