统计过程控制的实施为矿山生产安全干预改进提供预警信号

Arya Nugraha, G. Yudoko
{"title":"统计过程控制的实施为矿山生产安全干预改进提供预警信号","authors":"Arya Nugraha, G. Yudoko","doi":"10.21776/UB.JEMIS.2020.008.02.4","DOIUrl":null,"url":null,"abstract":"As the frequency, severity, and costs of safety risks continue to become a challenge for mining industry, the company understood that the existing safety analytic does not provide adequate information, as it has been relying predominantly on collecting and evaluating aggregated data of lagging indicators about past accidents. This method has been negatively driving the organization to carry out repetitive cycle of accident analysis and problem solving, and therefore, undertaking reactive responses. This paper investigated how statistical process control, in particular control charts, can be applied to hazards data, as the leading indicator of accidents, to detect statistically trends in safety process and safety behavior, aiming to control the safety process in real-time manner before the occurrence of accidents. The result showed that the latest iteration of control limits development in Phase 3 is suitable as the control chart for safety process in one of case study mine operation site. Furthermore, the implementation of control charts to hazards data not only it helps the organization to transition its safety analytic to leading indicator analysis, it enables the organization to control safety process in real-time practice and to carry out timely safety intervention long before the potential occurrence of severe accidents, in which within this case, the first early warning signal was triggered 49 days before the occurrence of the fatality accident.","PeriodicalId":31704,"journal":{"name":"Journal of Engineering Management and Competitiveness","volume":"61 1","pages":"32-55"},"PeriodicalIF":0.0000,"publicationDate":"2020-11-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"STATISTICAL PROCESS CONTROL IMPLEMENTATION AS EARLY WARNING SIGNAL FOR SAFETY INTERVENTION IMPROVEMENT AT MINING OPERATION\",\"authors\":\"Arya Nugraha, G. Yudoko\",\"doi\":\"10.21776/UB.JEMIS.2020.008.02.4\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"As the frequency, severity, and costs of safety risks continue to become a challenge for mining industry, the company understood that the existing safety analytic does not provide adequate information, as it has been relying predominantly on collecting and evaluating aggregated data of lagging indicators about past accidents. This method has been negatively driving the organization to carry out repetitive cycle of accident analysis and problem solving, and therefore, undertaking reactive responses. This paper investigated how statistical process control, in particular control charts, can be applied to hazards data, as the leading indicator of accidents, to detect statistically trends in safety process and safety behavior, aiming to control the safety process in real-time manner before the occurrence of accidents. The result showed that the latest iteration of control limits development in Phase 3 is suitable as the control chart for safety process in one of case study mine operation site. Furthermore, the implementation of control charts to hazards data not only it helps the organization to transition its safety analytic to leading indicator analysis, it enables the organization to control safety process in real-time practice and to carry out timely safety intervention long before the potential occurrence of severe accidents, in which within this case, the first early warning signal was triggered 49 days before the occurrence of the fatality accident.\",\"PeriodicalId\":31704,\"journal\":{\"name\":\"Journal of Engineering Management and Competitiveness\",\"volume\":\"61 1\",\"pages\":\"32-55\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-11-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Engineering Management and Competitiveness\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.21776/UB.JEMIS.2020.008.02.4\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Engineering Management and Competitiveness","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21776/UB.JEMIS.2020.008.02.4","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

随着安全风险的频率、严重程度和成本不断成为采矿业面临的挑战,该公司明白,现有的安全分析不能提供足够的信息,因为它主要依赖于收集和评估过去事故的滞后指标汇总数据。这种方法一直在消极地推动组织进行事故分析和问题解决的重复循环,因此,承担被动响应。本文研究了如何将统计过程控制特别是控制图应用于作为事故先行指标的危害数据,检测安全过程和安全行为的统计趋势,以期在事故发生前对安全过程进行实时控制。结果表明,第三阶段控制界限开发的最新迭代可以作为某实例矿山生产现场安全过程的控制图。此外,对危害数据实施控制图不仅有助于组织从安全分析过渡到先行指标分析,还能使组织在严重事故潜在发生之前就能实时控制安全过程,及时进行安全干预,在该案例中,在致命事故发生前49天就触发了第一个预警信号。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
STATISTICAL PROCESS CONTROL IMPLEMENTATION AS EARLY WARNING SIGNAL FOR SAFETY INTERVENTION IMPROVEMENT AT MINING OPERATION
As the frequency, severity, and costs of safety risks continue to become a challenge for mining industry, the company understood that the existing safety analytic does not provide adequate information, as it has been relying predominantly on collecting and evaluating aggregated data of lagging indicators about past accidents. This method has been negatively driving the organization to carry out repetitive cycle of accident analysis and problem solving, and therefore, undertaking reactive responses. This paper investigated how statistical process control, in particular control charts, can be applied to hazards data, as the leading indicator of accidents, to detect statistically trends in safety process and safety behavior, aiming to control the safety process in real-time manner before the occurrence of accidents. The result showed that the latest iteration of control limits development in Phase 3 is suitable as the control chart for safety process in one of case study mine operation site. Furthermore, the implementation of control charts to hazards data not only it helps the organization to transition its safety analytic to leading indicator analysis, it enables the organization to control safety process in real-time practice and to carry out timely safety intervention long before the potential occurrence of severe accidents, in which within this case, the first early warning signal was triggered 49 days before the occurrence of the fatality accident.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
7
审稿时长
4 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信