最近NASA任务中仪器进度增长对任务成本和进度增长的影响

K. A. Kipp, S. Ringler, E. L. Chapman, C. Freaner
{"title":"最近NASA任务中仪器进度增长对任务成本和进度增长的影响","authors":"K. A. Kipp, S. Ringler, E. L. Chapman, C. Freaner","doi":"10.1109/AERO.2012.6187407","DOIUrl":null,"url":null,"abstract":"This study explores instrument schedule delays and their impacts on mission development schedule and cost growth for recent NASA missions. This study examines 86 instruments across 32 NASA missions. First, the relationship between instrument schedule growth and mission development cost growth is examined. It is found that instrument development delays have a prominent role in contributing to mission development schedule and cost growth. Second, instrument developments are analyzed in order to explore specific trends related to schedule growth and to determine potential contributing factors. Instrument schedule growth is examined as a function of mass, power, instrument type, and spacecraft destination. The results are then used to establish schedule rules-of-thumb that can be used for planning purposes by project and program managers in charge of future NASA development efforts.","PeriodicalId":6421,"journal":{"name":"2012 IEEE Aerospace Conference","volume":"17 1","pages":"1-13"},"PeriodicalIF":0.0000,"publicationDate":"2012-03-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Impact of instrument schedule growth on mission cost and schedule growth for recent NASA missions\",\"authors\":\"K. A. Kipp, S. Ringler, E. L. Chapman, C. Freaner\",\"doi\":\"10.1109/AERO.2012.6187407\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study explores instrument schedule delays and their impacts on mission development schedule and cost growth for recent NASA missions. This study examines 86 instruments across 32 NASA missions. First, the relationship between instrument schedule growth and mission development cost growth is examined. It is found that instrument development delays have a prominent role in contributing to mission development schedule and cost growth. Second, instrument developments are analyzed in order to explore specific trends related to schedule growth and to determine potential contributing factors. Instrument schedule growth is examined as a function of mass, power, instrument type, and spacecraft destination. The results are then used to establish schedule rules-of-thumb that can be used for planning purposes by project and program managers in charge of future NASA development efforts.\",\"PeriodicalId\":6421,\"journal\":{\"name\":\"2012 IEEE Aerospace Conference\",\"volume\":\"17 1\",\"pages\":\"1-13\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2012-03-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2012 IEEE Aerospace Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/AERO.2012.6187407\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 IEEE Aerospace Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/AERO.2012.6187407","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

本研究探讨了最近NASA任务中仪器进度延迟及其对任务开发进度和成本增长的影响。这项研究检查了NASA 32个任务中的86种仪器。首先,研究了仪器进度增长与任务开发成本增长之间的关系。研究发现,仪器开发延迟对特派团开发进度和成本增长有显著影响。其次,分析仪器的发展,以探索与进度增长相关的具体趋势,并确定潜在的促成因素。仪器计划增长作为质量、功率、仪器类型和航天器目的地的函数进行检查。然后,这些结果被用来建立时间表的经验法则,这些规则可以被负责未来NASA开发工作的项目和项目经理用于计划目的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Impact of instrument schedule growth on mission cost and schedule growth for recent NASA missions
This study explores instrument schedule delays and their impacts on mission development schedule and cost growth for recent NASA missions. This study examines 86 instruments across 32 NASA missions. First, the relationship between instrument schedule growth and mission development cost growth is examined. It is found that instrument development delays have a prominent role in contributing to mission development schedule and cost growth. Second, instrument developments are analyzed in order to explore specific trends related to schedule growth and to determine potential contributing factors. Instrument schedule growth is examined as a function of mass, power, instrument type, and spacecraft destination. The results are then used to establish schedule rules-of-thumb that can be used for planning purposes by project and program managers in charge of future NASA development efforts.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信