{"title":"共享机器u型装配线中的任务和工人分配","authors":"P. Khemyong, R. Sirovetnukul","doi":"10.1109/IEEM.2013.6962427","DOIUrl":null,"url":null,"abstract":"This study presents a new approach on a U-shaped line namely, task and worker (double) assignment in the shared-machine U-shaped assembly line. A case study was done on a garment manufacturing company in Thailand. In order to revolutionize and consider the lean concept of waste reduction and synchronous move, three objective functions were considered: minimizing the number of workstations (workers), minimizing walking time, and maximizing full work. The results showed that the shared-machine U-shaped line has the same number of workstations (or workers) as the straight line and traditional U-line but the walking time is less than the latter while the utilization of worker is satisfying. In addition, the utilization of machine is better than other lines. Hence, the proposed model can help improve the double assignment and increase machine and worker utilization of a manufacturing company.","PeriodicalId":6454,"journal":{"name":"2013 IEEE International Conference on Industrial Engineering and Engineering Management","volume":"61 1","pages":"325-329"},"PeriodicalIF":0.0000,"publicationDate":"2013-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Task and worker assignment in the shared-machine U-shaped assembly line\",\"authors\":\"P. Khemyong, R. Sirovetnukul\",\"doi\":\"10.1109/IEEM.2013.6962427\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study presents a new approach on a U-shaped line namely, task and worker (double) assignment in the shared-machine U-shaped assembly line. A case study was done on a garment manufacturing company in Thailand. In order to revolutionize and consider the lean concept of waste reduction and synchronous move, three objective functions were considered: minimizing the number of workstations (workers), minimizing walking time, and maximizing full work. The results showed that the shared-machine U-shaped line has the same number of workstations (or workers) as the straight line and traditional U-line but the walking time is less than the latter while the utilization of worker is satisfying. In addition, the utilization of machine is better than other lines. Hence, the proposed model can help improve the double assignment and increase machine and worker utilization of a manufacturing company.\",\"PeriodicalId\":6454,\"journal\":{\"name\":\"2013 IEEE International Conference on Industrial Engineering and Engineering Management\",\"volume\":\"61 1\",\"pages\":\"325-329\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2013-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2013 IEEE International Conference on Industrial Engineering and Engineering Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IEEM.2013.6962427\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 IEEE International Conference on Industrial Engineering and Engineering Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEEM.2013.6962427","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

本文提出了一种u型线的新方法,即共享机器u型装配线的任务和工人(双)分配。本文对泰国一家服装制造公司进行了案例研究。为了革新和考虑减少浪费和同步移动的精益概念,考虑了三个目标函数:最小化工作站(工人)数量,最小化步行时间和最大化充分工作。结果表明,共享机器u型线与直线线和传统u型线具有相同的工作站(或工人)数量,但步行时间少于传统u型线,同时工人的利用率令人满意。此外,机器的利用率优于其他生产线。因此,所提出的模型有助于改善制造企业的双重分配,提高机器和工人的利用率。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Task and worker assignment in the shared-machine U-shaped assembly line
This study presents a new approach on a U-shaped line namely, task and worker (double) assignment in the shared-machine U-shaped assembly line. A case study was done on a garment manufacturing company in Thailand. In order to revolutionize and consider the lean concept of waste reduction and synchronous move, three objective functions were considered: minimizing the number of workstations (workers), minimizing walking time, and maximizing full work. The results showed that the shared-machine U-shaped line has the same number of workstations (or workers) as the straight line and traditional U-line but the walking time is less than the latter while the utilization of worker is satisfying. In addition, the utilization of machine is better than other lines. Hence, the proposed model can help improve the double assignment and increase machine and worker utilization of a manufacturing company.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信