{"title":"多阶段混合装配线看板控制系统的设计与应用","authors":"Lei YANG, Xiao-peng ZHANG","doi":"10.1016/S1874-8651(10)60070-1","DOIUrl":null,"url":null,"abstract":"<div><p>This article studies the parameter design and the performance optimization of a Kanban system without stockouts in a multi-stage, mixed-model assembly line. The model of a Kanban system based on production processes is established by examining the relationship among the set-up time, the amount of work in process (WIP), the capacity indicated by a Kanban, and the takt-time ratio. A novel method for optimizing performance on the premise of no stockouts is proposed. Empirical results show that the amount of WIP is reduced remarkably after optimization.</p></div>","PeriodicalId":101206,"journal":{"name":"Systems Engineering - Theory & Practice","volume":"29 9","pages":"Pages 64-72"},"PeriodicalIF":0.0000,"publicationDate":"2009-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/S1874-8651(10)60070-1","citationCount":"7","resultStr":"{\"title\":\"Design and Application of Kanban Control System in a Multi-Stage, Mixed-Model Assembly Line\",\"authors\":\"Lei YANG, Xiao-peng ZHANG\",\"doi\":\"10.1016/S1874-8651(10)60070-1\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>This article studies the parameter design and the performance optimization of a Kanban system without stockouts in a multi-stage, mixed-model assembly line. The model of a Kanban system based on production processes is established by examining the relationship among the set-up time, the amount of work in process (WIP), the capacity indicated by a Kanban, and the takt-time ratio. A novel method for optimizing performance on the premise of no stockouts is proposed. Empirical results show that the amount of WIP is reduced remarkably after optimization.</p></div>\",\"PeriodicalId\":101206,\"journal\":{\"name\":\"Systems Engineering - Theory & Practice\",\"volume\":\"29 9\",\"pages\":\"Pages 64-72\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1016/S1874-8651(10)60070-1\",\"citationCount\":\"7\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Systems Engineering - Theory & Practice\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S1874865110600701\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Systems Engineering - Theory & Practice","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S1874865110600701","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Design and Application of Kanban Control System in a Multi-Stage, Mixed-Model Assembly Line
This article studies the parameter design and the performance optimization of a Kanban system without stockouts in a multi-stage, mixed-model assembly line. The model of a Kanban system based on production processes is established by examining the relationship among the set-up time, the amount of work in process (WIP), the capacity indicated by a Kanban, and the takt-time ratio. A novel method for optimizing performance on the premise of no stockouts is proposed. Empirical results show that the amount of WIP is reduced remarkably after optimization.