{"title":"非组合式透丝止水带止水螺钉模板安装施工研究","authors":"Yang Xie, Yihui Liu, Zhen Liu, Jisong Chen","doi":"10.26789/jzjg.v7i6.1569","DOIUrl":null,"url":null,"abstract":"The threaded rod without water stop plate is used to replace the original water stop bolt. The threaded rod is composed of a full-length threaded rod, a tapered screw sleeve and a nut. With the help of the threaded rod, the water seepage path of the wall is changed, the water seepage line is extended, and the water pressure is reduced, so as to achieve the water stop effect. Its implementation not only reduces the processing difficulty, but also can adjust the bolt buckle spacing according to the thickness of the outer wall of the basement, effectively strengthen the formwork, and reduce the risk of formwork expansion and explosion; It can be manually removed to reduce on-site hot work. It is a better choice for the basement wall formwork system.","PeriodicalId":67191,"journal":{"name":"建筑结构","volume":"4 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-08-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Research on Formwork Erection Construction of Non Combined Through Wire Water Stop Screw of Impermeable Wall\",\"authors\":\"Yang Xie, Yihui Liu, Zhen Liu, Jisong Chen\",\"doi\":\"10.26789/jzjg.v7i6.1569\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The threaded rod without water stop plate is used to replace the original water stop bolt. The threaded rod is composed of a full-length threaded rod, a tapered screw sleeve and a nut. With the help of the threaded rod, the water seepage path of the wall is changed, the water seepage line is extended, and the water pressure is reduced, so as to achieve the water stop effect. Its implementation not only reduces the processing difficulty, but also can adjust the bolt buckle spacing according to the thickness of the outer wall of the basement, effectively strengthen the formwork, and reduce the risk of formwork expansion and explosion; It can be manually removed to reduce on-site hot work. It is a better choice for the basement wall formwork system.\",\"PeriodicalId\":67191,\"journal\":{\"name\":\"建筑结构\",\"volume\":\"4 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-08-11\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"建筑结构\",\"FirstCategoryId\":\"1087\",\"ListUrlMain\":\"https://doi.org/10.26789/jzjg.v7i6.1569\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"建筑结构","FirstCategoryId":"1087","ListUrlMain":"https://doi.org/10.26789/jzjg.v7i6.1569","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Research on Formwork Erection Construction of Non Combined Through Wire Water Stop Screw of Impermeable Wall
The threaded rod without water stop plate is used to replace the original water stop bolt. The threaded rod is composed of a full-length threaded rod, a tapered screw sleeve and a nut. With the help of the threaded rod, the water seepage path of the wall is changed, the water seepage line is extended, and the water pressure is reduced, so as to achieve the water stop effect. Its implementation not only reduces the processing difficulty, but also can adjust the bolt buckle spacing according to the thickness of the outer wall of the basement, effectively strengthen the formwork, and reduce the risk of formwork expansion and explosion; It can be manually removed to reduce on-site hot work. It is a better choice for the basement wall formwork system.