{"title":"蒙特卡罗法用于输电线路雷电性能分析的一种新的停止准则评估","authors":"Frederico S. Almeida, F. H. Silveira, S. Visacro","doi":"10.1109/ICLPandSIPDA54065.2021.9627379","DOIUrl":null,"url":null,"abstract":"This paper evaluates the use of the Monte Carlo method for the assessment of the lightning performance of transmission lines. By the application of the ATP-DE-MC, an interface between the Monte Carlo method and the software ATP, the critical current and the backflashover probability for a typical 138-kV transmission line under different tower-footing grounding impedance ZP are calculated. From the analysis of the results for different number of Monte Carlo rounds, a stopping criterion is proposed based on the simultaneous consideration of the error of the probability distribution and the dispersion coefficient. It was shown that evaluations of the lightning performance of transmission lines related to high critical current demand more Monte Carlo rounds and consequently more computational efforts and simulation time. The use of the stopping criterion provides decreases of 21% in the number of rounds for ZP of 10 Ω and 92% for ZP of 40 Ω and 80 Ω, maintaining consistent and feasible results that ensure its use in the Monte Carlo method execution.","PeriodicalId":70714,"journal":{"name":"中国防雷","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2021-09-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"On the Assessment of a New Stopping Criterion for the Monte Carlo Method Applied to the Analysis of the Lightning Performance of Transmission Lines\",\"authors\":\"Frederico S. Almeida, F. H. Silveira, S. Visacro\",\"doi\":\"10.1109/ICLPandSIPDA54065.2021.9627379\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper evaluates the use of the Monte Carlo method for the assessment of the lightning performance of transmission lines. By the application of the ATP-DE-MC, an interface between the Monte Carlo method and the software ATP, the critical current and the backflashover probability for a typical 138-kV transmission line under different tower-footing grounding impedance ZP are calculated. From the analysis of the results for different number of Monte Carlo rounds, a stopping criterion is proposed based on the simultaneous consideration of the error of the probability distribution and the dispersion coefficient. It was shown that evaluations of the lightning performance of transmission lines related to high critical current demand more Monte Carlo rounds and consequently more computational efforts and simulation time. The use of the stopping criterion provides decreases of 21% in the number of rounds for ZP of 10 Ω and 92% for ZP of 40 Ω and 80 Ω, maintaining consistent and feasible results that ensure its use in the Monte Carlo method execution.\",\"PeriodicalId\":70714,\"journal\":{\"name\":\"中国防雷\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-09-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"中国防雷\",\"FirstCategoryId\":\"1089\",\"ListUrlMain\":\"https://doi.org/10.1109/ICLPandSIPDA54065.2021.9627379\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"中国防雷","FirstCategoryId":"1089","ListUrlMain":"https://doi.org/10.1109/ICLPandSIPDA54065.2021.9627379","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

本文对蒙特卡罗法在输电线路防雷性能评估中的应用进行了评价。应用Monte - Carlo方法与ATP软件的接口ATP- de - mc,计算了典型138-kV输电线路在不同塔基接地阻抗ZP下的临界电流和反闪络概率。通过对不同弹数的结果分析,提出了一种同时考虑概率分布误差和离散系数误差的停止判据。结果表明,在高临界电流条件下,输电线路雷电性能的评估需要更多的蒙特卡罗算法,从而需要更多的计算量和模拟时间。停止准则的使用使ZP为10 Ω时的轮数减少21%,ZP为40 Ω和80 Ω时的轮数减少92%,保持了一致和可行的结果,确保了它在蒙特卡罗方法执行中的使用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
On the Assessment of a New Stopping Criterion for the Monte Carlo Method Applied to the Analysis of the Lightning Performance of Transmission Lines
This paper evaluates the use of the Monte Carlo method for the assessment of the lightning performance of transmission lines. By the application of the ATP-DE-MC, an interface between the Monte Carlo method and the software ATP, the critical current and the backflashover probability for a typical 138-kV transmission line under different tower-footing grounding impedance ZP are calculated. From the analysis of the results for different number of Monte Carlo rounds, a stopping criterion is proposed based on the simultaneous consideration of the error of the probability distribution and the dispersion coefficient. It was shown that evaluations of the lightning performance of transmission lines related to high critical current demand more Monte Carlo rounds and consequently more computational efforts and simulation time. The use of the stopping criterion provides decreases of 21% in the number of rounds for ZP of 10 Ω and 92% for ZP of 40 Ω and 80 Ω, maintaining consistent and feasible results that ensure its use in the Monte Carlo method execution.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
57
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信