{"title":"克拉2气田精细地质建模技术","authors":"Zhao-long Liu, Yongzhong Zhang, Hua-lin Liu, Dongfeng Chen, Min Yang, Ming Li, Peng Zhou, Zhen-hua Guo, Weigang Huang","doi":"10.35248/2157-7463.21.12.436","DOIUrl":null,"url":null,"abstract":"As the major gas resource of the West-East Gas Transmission Project, Kela 2 gas field plays an important role in the natural gas industry development and social demand in China. After 17 years development, annual gas production of Kela 2 gas field is stable in over 5 billion cubic meters, which has great reference value for the other gas field’s development. Kela 2 gas field is in the middle-late development period at present, some gas wells experienced water flooding in advance, which has resulted in a productivity decrease. Main challenges at current development period are development scheme adjustments such as water invasion prevention, water invasion control, production allocation optimization, and the conventional geological modeling cannot meet the scale requirement for the development scheme adjustment. By using the fine scale geological modeling techniques, it could provide a basis for the study of remaining reserves distribution, horizontal well deployment, water control and drainage scheme design.","PeriodicalId":16699,"journal":{"name":"Journal of Petroleum & Environmental Biotechnology","volume":"128 1","pages":"1-6"},"PeriodicalIF":0.0000,"publicationDate":"2021-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Fine Scale Geological Modeling Techniques in Kela 2 Gas Field\",\"authors\":\"Zhao-long Liu, Yongzhong Zhang, Hua-lin Liu, Dongfeng Chen, Min Yang, Ming Li, Peng Zhou, Zhen-hua Guo, Weigang Huang\",\"doi\":\"10.35248/2157-7463.21.12.436\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"As the major gas resource of the West-East Gas Transmission Project, Kela 2 gas field plays an important role in the natural gas industry development and social demand in China. After 17 years development, annual gas production of Kela 2 gas field is stable in over 5 billion cubic meters, which has great reference value for the other gas field’s development. Kela 2 gas field is in the middle-late development period at present, some gas wells experienced water flooding in advance, which has resulted in a productivity decrease. Main challenges at current development period are development scheme adjustments such as water invasion prevention, water invasion control, production allocation optimization, and the conventional geological modeling cannot meet the scale requirement for the development scheme adjustment. By using the fine scale geological modeling techniques, it could provide a basis for the study of remaining reserves distribution, horizontal well deployment, water control and drainage scheme design.\",\"PeriodicalId\":16699,\"journal\":{\"name\":\"Journal of Petroleum & Environmental Biotechnology\",\"volume\":\"128 1\",\"pages\":\"1-6\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Petroleum & Environmental Biotechnology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.35248/2157-7463.21.12.436\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Petroleum & Environmental Biotechnology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.35248/2157-7463.21.12.436","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

克拉2气田作为西气东输工程的主要天然气资源,在中国天然气工业发展和社会需求中发挥着重要作用。克拉2气田经过17年的开发,年产气量稳定在50亿立方米以上,对其他气田的开发具有重要的参考价值。克拉2气田目前处于开发中后期,部分气井发生超前水淹,导致产能下降。当前开发阶段面临的主要挑战是防水、防水、优化生产配置等开发方案调整,常规地质建模不能满足开发方案调整的规模要求。利用精细尺度地质建模技术,可为剩余储量分布、水平井部署、控排水方案设计等研究提供依据。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Fine Scale Geological Modeling Techniques in Kela 2 Gas Field
As the major gas resource of the West-East Gas Transmission Project, Kela 2 gas field plays an important role in the natural gas industry development and social demand in China. After 17 years development, annual gas production of Kela 2 gas field is stable in over 5 billion cubic meters, which has great reference value for the other gas field’s development. Kela 2 gas field is in the middle-late development period at present, some gas wells experienced water flooding in advance, which has resulted in a productivity decrease. Main challenges at current development period are development scheme adjustments such as water invasion prevention, water invasion control, production allocation optimization, and the conventional geological modeling cannot meet the scale requirement for the development scheme adjustment. By using the fine scale geological modeling techniques, it could provide a basis for the study of remaining reserves distribution, horizontal well deployment, water control and drainage scheme design.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信