(二)修建贝加尔湖-阿穆尔河干线

IF 0.4 Q1 HISTORY
Olga Povoroznyuk
{"title":"(二)修建贝加尔湖-阿穆尔河干线","authors":"Olga Povoroznyuk","doi":"10.3167/TRANS.2020.10020317","DOIUrl":null,"url":null,"abstract":"\nThe construction of the Baikal-Amur Mainline (BAM) in East Siberia and the Russian Far East in the 1970s and 1980s was the largest technological and social engineering project of late socialism. After the dissolution of the Soviet Union, the BAM was dogged by economic bust, decline, and public disillusionment. BAM-2, a recently launched state program of technological modernization, aims to complete a second railway track. The project elicits memories as well as new hopes and expectations, especially among “builders of the BAM.” This article explores continuity and change between BAM-1 and BAM-2. It argues that the reconstruction efforts of the postsocialist state are predetermined by the durability of the infrastructure as a materialization of collective identities, memories, and emotions.","PeriodicalId":43789,"journal":{"name":"Transfers-Interdisciplinary Journal of Mobility Studies","volume":"1 1","pages":""},"PeriodicalIF":0.4000,"publicationDate":"2020-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"(Re)Constructing the Baikal-Amur Mainline\",\"authors\":\"Olga Povoroznyuk\",\"doi\":\"10.3167/TRANS.2020.10020317\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\nThe construction of the Baikal-Amur Mainline (BAM) in East Siberia and the Russian Far East in the 1970s and 1980s was the largest technological and social engineering project of late socialism. After the dissolution of the Soviet Union, the BAM was dogged by economic bust, decline, and public disillusionment. BAM-2, a recently launched state program of technological modernization, aims to complete a second railway track. The project elicits memories as well as new hopes and expectations, especially among “builders of the BAM.” This article explores continuity and change between BAM-1 and BAM-2. It argues that the reconstruction efforts of the postsocialist state are predetermined by the durability of the infrastructure as a materialization of collective identities, memories, and emotions.\",\"PeriodicalId\":43789,\"journal\":{\"name\":\"Transfers-Interdisciplinary Journal of Mobility Studies\",\"volume\":\"1 1\",\"pages\":\"\"},\"PeriodicalIF\":0.4000,\"publicationDate\":\"2020-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Transfers-Interdisciplinary Journal of Mobility Studies\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.3167/TRANS.2020.10020317\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"HISTORY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Transfers-Interdisciplinary Journal of Mobility Studies","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3167/TRANS.2020.10020317","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"HISTORY","Score":null,"Total":0}
引用次数: 2

摘要

上世纪七八十年代在东西伯利亚和俄罗斯远东地区修建的贝加尔湖-阿穆尔河干线(BAM)是社会主义后期最大的技术和社会工程项目。苏联解体后,BAM受到经济萧条、衰退和公众幻想破灭的困扰。bam2是最近启动的国家技术现代化计划,旨在完成第二条铁路轨道。该项目唤起了人们的回忆,也唤起了新的希望和期望,尤其是“BAM的建设者”。本文探讨了BAM-1和BAM-2之间的连续性和变化。它认为,后社会主义国家的重建工作是由作为集体身份、记忆和情感物化的基础设施的耐久性决定的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
(Re)Constructing the Baikal-Amur Mainline
The construction of the Baikal-Amur Mainline (BAM) in East Siberia and the Russian Far East in the 1970s and 1980s was the largest technological and social engineering project of late socialism. After the dissolution of the Soviet Union, the BAM was dogged by economic bust, decline, and public disillusionment. BAM-2, a recently launched state program of technological modernization, aims to complete a second railway track. The project elicits memories as well as new hopes and expectations, especially among “builders of the BAM.” This article explores continuity and change between BAM-1 and BAM-2. It argues that the reconstruction efforts of the postsocialist state are predetermined by the durability of the infrastructure as a materialization of collective identities, memories, and emotions.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
0.70
自引率
33.30%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信