{"title":"论证新建FPSO船体平台在各油田的可行性","authors":"Yasuhiro Sogawa, Shigeru Tanaka","doi":"10.4043/29554-MS","DOIUrl":null,"url":null,"abstract":"\n It is a challenging problem to achieve low cost and fast-track construction for new-build FPSO hulls. In order to cope with this problem, the authors developed and reported unique modular design and multi-yard construction concept, \"noah-FPSO Hull\" [1][2][3]. After that, the authors continued to improve its design and expanded its flexibility for harsh environment and customer's requests. As a result, new standardized fore/aft modules and cargo tank module have been developed to expand the flexibility. This paper presents the design of the newly developed modules and the feasibility for harsh environment.","PeriodicalId":10948,"journal":{"name":"Day 2 Tue, May 07, 2019","volume":"30 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-04-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Demonstrating the Feasibility of New-Build Hull-Platform for FPSO in Various Oil Field\",\"authors\":\"Yasuhiro Sogawa, Shigeru Tanaka\",\"doi\":\"10.4043/29554-MS\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n It is a challenging problem to achieve low cost and fast-track construction for new-build FPSO hulls. In order to cope with this problem, the authors developed and reported unique modular design and multi-yard construction concept, \\\"noah-FPSO Hull\\\" [1][2][3]. After that, the authors continued to improve its design and expanded its flexibility for harsh environment and customer's requests. As a result, new standardized fore/aft modules and cargo tank module have been developed to expand the flexibility. This paper presents the design of the newly developed modules and the feasibility for harsh environment.\",\"PeriodicalId\":10948,\"journal\":{\"name\":\"Day 2 Tue, May 07, 2019\",\"volume\":\"30 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-04-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 2 Tue, May 07, 2019\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4043/29554-MS\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Tue, May 07, 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4043/29554-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Demonstrating the Feasibility of New-Build Hull-Platform for FPSO in Various Oil Field
It is a challenging problem to achieve low cost and fast-track construction for new-build FPSO hulls. In order to cope with this problem, the authors developed and reported unique modular design and multi-yard construction concept, "noah-FPSO Hull" [1][2][3]. After that, the authors continued to improve its design and expanded its flexibility for harsh environment and customer's requests. As a result, new standardized fore/aft modules and cargo tank module have been developed to expand the flexibility. This paper presents the design of the newly developed modules and the feasibility for harsh environment.