大流行为成功的预留请求提供了基础

{"title":"大流行为成功的预留请求提供了基础","authors":"","doi":"10.1002/npc.30933","DOIUrl":null,"url":null,"abstract":"<div>\n <p>The IRS approved a private foundation's set-aside program, reflecting the “tremendous impact the COVID 19 shutdown” in a state “has had on all current construction projects” (Priv. Ltr. Rul. 202053017). The purpose of the requested set-aside “is to ensure that these projects will be properly managed, monitored and brought to a satisfactory and quality conclusion in a successful and timely manner.” The foundation asserted it would not be prudent to pay the contractors the total amount prior to the completion of the entire job.” It observed that, due to the pandemic, the “timelines for when these projects will be completed is uncertain.” The final successful argument was that this set-aside approach will allow the foundation to “maximize control over the projects, with the goal of a achieving a better and successful result.”</p>\n </div>","PeriodicalId":100204,"journal":{"name":"Bruce R. Hopkins' Nonprofit Counsel","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2021-11-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://onlinelibrary.wiley.com/doi/epdf/10.1002/npc.30933","citationCount":"0","resultStr":"{\"title\":\"Pandemic Provides Basis for Successful Set-Aside Requests\",\"authors\":\"\",\"doi\":\"10.1002/npc.30933\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div>\\n <p>The IRS approved a private foundation's set-aside program, reflecting the “tremendous impact the COVID 19 shutdown” in a state “has had on all current construction projects” (Priv. Ltr. Rul. 202053017). The purpose of the requested set-aside “is to ensure that these projects will be properly managed, monitored and brought to a satisfactory and quality conclusion in a successful and timely manner.” The foundation asserted it would not be prudent to pay the contractors the total amount prior to the completion of the entire job.” It observed that, due to the pandemic, the “timelines for when these projects will be completed is uncertain.” The final successful argument was that this set-aside approach will allow the foundation to “maximize control over the projects, with the goal of a achieving a better and successful result.”</p>\\n </div>\",\"PeriodicalId\":100204,\"journal\":{\"name\":\"Bruce R. Hopkins' Nonprofit Counsel\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-11-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://onlinelibrary.wiley.com/doi/epdf/10.1002/npc.30933\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Bruce R. Hopkins' Nonprofit Counsel\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://onlinelibrary.wiley.com/doi/10.1002/npc.30933\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Bruce R. Hopkins' Nonprofit Counsel","FirstCategoryId":"1085","ListUrlMain":"https://onlinelibrary.wiley.com/doi/10.1002/npc.30933","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

美国国税局批准了一个私人基金会的预留计划,反映了一个州“COVID - 19停工”对“所有当前建设项目”的巨大影响(Priv. Ltr. Rul. 202053017)。要求预留的目的是“确保这些项目得到适当的管理和监测,并以成功和及时的方式取得令人满意和高质量的结论”。基金会表示,在完成全部工作之前向承包商支付全部费用是不明智的。”它指出,由于大流行,“这些项目何时完成的时间表不确定”。最后一个成功的论点是,这种留出的方法将允许基金会“最大限度地控制项目,以取得更好和成功的结果为目标”。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Pandemic Provides Basis for Successful Set-Aside Requests

The IRS approved a private foundation's set-aside program, reflecting the “tremendous impact the COVID 19 shutdown” in a state “has had on all current construction projects” (Priv. Ltr. Rul. 202053017). The purpose of the requested set-aside “is to ensure that these projects will be properly managed, monitored and brought to a satisfactory and quality conclusion in a successful and timely manner.” The foundation asserted it would not be prudent to pay the contractors the total amount prior to the completion of the entire job.” It observed that, due to the pandemic, the “timelines for when these projects will be completed is uncertain.” The final successful argument was that this set-aside approach will allow the foundation to “maximize control over the projects, with the goal of a achieving a better and successful result.”

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信