Yu-ling Jiao, Xue Deng, Lin Li, Xinran Liu, Nan Cao
{"title":"基于多优先规则启发式算法的双面u型装配线平衡建模与求解","authors":"Yu-ling Jiao, Xue Deng, Lin Li, Xinran Liu, Nan Cao","doi":"10.1177/1063293X221104527","DOIUrl":null,"url":null,"abstract":"In order to improve the efficiency of assembly line and optimize the layout, this paper presents a collaborative optimization model for a two-sided U-type assembly line and a novel design with p-l partition layout is proposed to minimize number of workstations without increasing the length of the assembly line. Considering the task orientation and time sequencing in cross-workstation, the mathematical model of two-sided U-type assembly line balancing problem is derived. A multi-level priority rule heuristic algorithm is developed to drive the optimization process. The multi-level priority rule heuristic algorithm, modified particle swarm optimization algorithm, and the bi-objective integer programming method are applied to 20 classic examples, respectively. The calculation results suggest that the optimal results of the proposed method account for 90%, which verifies the rationality of the collaborative optimization model and algorithm, and provides a useful reference for the modeling and solution of the two-sided U-type assembly line balancing problems.","PeriodicalId":10680,"journal":{"name":"Concurrent Engineering","volume":"23 1","pages":"262 - 272"},"PeriodicalIF":0.0000,"publicationDate":"2022-06-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Modeling and solving the two-sided U-type assembly line balance based on a heuristic algorithm of a multi-priority rule\",\"authors\":\"Yu-ling Jiao, Xue Deng, Lin Li, Xinran Liu, Nan Cao\",\"doi\":\"10.1177/1063293X221104527\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In order to improve the efficiency of assembly line and optimize the layout, this paper presents a collaborative optimization model for a two-sided U-type assembly line and a novel design with p-l partition layout is proposed to minimize number of workstations without increasing the length of the assembly line. Considering the task orientation and time sequencing in cross-workstation, the mathematical model of two-sided U-type assembly line balancing problem is derived. A multi-level priority rule heuristic algorithm is developed to drive the optimization process. The multi-level priority rule heuristic algorithm, modified particle swarm optimization algorithm, and the bi-objective integer programming method are applied to 20 classic examples, respectively. The calculation results suggest that the optimal results of the proposed method account for 90%, which verifies the rationality of the collaborative optimization model and algorithm, and provides a useful reference for the modeling and solution of the two-sided U-type assembly line balancing problems.\",\"PeriodicalId\":10680,\"journal\":{\"name\":\"Concurrent Engineering\",\"volume\":\"23 1\",\"pages\":\"262 - 272\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-06-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Concurrent Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1177/1063293X221104527\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Concurrent Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1177/1063293X221104527","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Modeling and solving the two-sided U-type assembly line balance based on a heuristic algorithm of a multi-priority rule
In order to improve the efficiency of assembly line and optimize the layout, this paper presents a collaborative optimization model for a two-sided U-type assembly line and a novel design with p-l partition layout is proposed to minimize number of workstations without increasing the length of the assembly line. Considering the task orientation and time sequencing in cross-workstation, the mathematical model of two-sided U-type assembly line balancing problem is derived. A multi-level priority rule heuristic algorithm is developed to drive the optimization process. The multi-level priority rule heuristic algorithm, modified particle swarm optimization algorithm, and the bi-objective integer programming method are applied to 20 classic examples, respectively. The calculation results suggest that the optimal results of the proposed method account for 90%, which verifies the rationality of the collaborative optimization model and algorithm, and provides a useful reference for the modeling and solution of the two-sided U-type assembly line balancing problems.