经济指标在微型矿山采矿地质信息系统山地工程中期规划方法论中的应用

A. Protsenko, J. B. Byyrov, G. Fedotov, L. Z. Zartenova
{"title":"经济指标在微型矿山采矿地质信息系统山地工程中期规划方法论中的应用","authors":"A. Protsenko, J. B. Byyrov, G. Fedotov, L. Z. Zartenova","doi":"10.17073/2500-0632-2018-2-60-67","DOIUrl":null,"url":null,"abstract":"The use of mining and geology information system is becoming more common in modern mining companies; therefore, the competent use of the functionality of software packages and development of  appropriated methodologies is a very important and urgent problem.  In this paper described method of middle-term planning in mining and geology information system Micromine for underground mining on an example of copper ore deposit with pillar- and-room system. Particular attention was paid to the consideration  of economic indicators in determining the sequence of mining. A list  of the necessary data for the implementation of this methodologies  in the scheduling of underground mining in the software product  Micromine is presented. Using of this method allow on planning stage to determine main technical and economic indicators,  as well as to estimate efficiency of selected direction of  mining. In this paper is provided example of reports and illustrations  of results of working of this method in mining and geology information system Micromine.","PeriodicalId":100929,"journal":{"name":"Mining Science and Technology","volume":"12 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2018-08-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"USE OF ECONOMIC INDICATORS IN METHODOLOGY OF MEDIUM- TERM PLANNING OF MOUNTAIN WORKS IN THE MICROMINE MINING-GEOLOGICAL INFORMATION SYSTEM\",\"authors\":\"A. Protsenko, J. B. Byyrov, G. Fedotov, L. Z. Zartenova\",\"doi\":\"10.17073/2500-0632-2018-2-60-67\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The use of mining and geology information system is becoming more common in modern mining companies; therefore, the competent use of the functionality of software packages and development of  appropriated methodologies is a very important and urgent problem.  In this paper described method of middle-term planning in mining and geology information system Micromine for underground mining on an example of copper ore deposit with pillar- and-room system. Particular attention was paid to the consideration  of economic indicators in determining the sequence of mining. A list  of the necessary data for the implementation of this methodologies  in the scheduling of underground mining in the software product  Micromine is presented. Using of this method allow on planning stage to determine main technical and economic indicators,  as well as to estimate efficiency of selected direction of  mining. In this paper is provided example of reports and illustrations  of results of working of this method in mining and geology information system Micromine.\",\"PeriodicalId\":100929,\"journal\":{\"name\":\"Mining Science and Technology\",\"volume\":\"12 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-08-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Mining Science and Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.17073/2500-0632-2018-2-60-67\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Mining Science and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.17073/2500-0632-2018-2-60-67","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

采矿地质信息系统在现代矿业公司的应用越来越普遍;因此,恰当地使用软件包的功能和开发适当的方法是一个非常重要和紧迫的问题。本文以铜矿床柱房式采矿地质信息系统Micromine为例,介绍了井下采矿地质信息系统的中期规划方法。在确定采矿顺序时特别注意考虑到经济指标。给出了在Micromine软件产品的地下采矿调度中实施该方法所需的数据列表。利用该方法可以在规划阶段确定主要技术经济指标,并对所选开采方向的效率进行估计。文中给出了该方法在采矿地质信息系统Micromine中工作结果的实例报告和说明。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
USE OF ECONOMIC INDICATORS IN METHODOLOGY OF MEDIUM- TERM PLANNING OF MOUNTAIN WORKS IN THE MICROMINE MINING-GEOLOGICAL INFORMATION SYSTEM
The use of mining and geology information system is becoming more common in modern mining companies; therefore, the competent use of the functionality of software packages and development of  appropriated methodologies is a very important and urgent problem.  In this paper described method of middle-term planning in mining and geology information system Micromine for underground mining on an example of copper ore deposit with pillar- and-room system. Particular attention was paid to the consideration  of economic indicators in determining the sequence of mining. A list  of the necessary data for the implementation of this methodologies  in the scheduling of underground mining in the software product  Micromine is presented. Using of this method allow on planning stage to determine main technical and economic indicators,  as well as to estimate efficiency of selected direction of  mining. In this paper is provided example of reports and illustrations  of results of working of this method in mining and geology information system Micromine.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信