实时执行和监控固井作业

A. Al-Yami, Moaathe A. Aljardan, Abrar A. Alshaikh, S. Gharbi
{"title":"实时执行和监控固井作业","authors":"A. Al-Yami, Moaathe A. Aljardan, Abrar A. Alshaikh, S. Gharbi","doi":"10.2118/194658-MS","DOIUrl":null,"url":null,"abstract":"\n Primary cementing operations rank among the more important events that occur during a well's lifetime. The cement sheath plays a critical role in establishing and maintaining zonal isolation in the well, supporting the casing and preventing external casing corrosion.\n For many years, the industry has employed strategies to promote optimal cement placement results. These strategies, collectively known in the industry as good cementing practices. Job execution is the key to insure success of the job based on the designed.\n New technology that give us optimum execution evaluation (OEE) has been developed to enhance cement job execution by overlapping the design parameter over with the execution parameter real time. The OEE technology significantly improves cementing operations, enabling operators to monitor, control, and evaluate cement placement in real time. OEE combines job design data with acquisition data from both the rig and the cementing equipment to provide a more accurate representation of the job as it is being run.\n In this paper, we present the process that we completed with detailed operational setup to allow us to monitor and record all parameters related to the cement job execution and the work flow implemented to be able to evaluate the cement job design and execution to achieve the required objectives. This study is also setting the basis to establish development of real time automated cementing advisory system.","PeriodicalId":11150,"journal":{"name":"Day 2 Wed, April 10, 2019","volume":"49 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-04-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Executing and Monitoring Cement Job Real Time\",\"authors\":\"A. Al-Yami, Moaathe A. Aljardan, Abrar A. Alshaikh, S. Gharbi\",\"doi\":\"10.2118/194658-MS\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Primary cementing operations rank among the more important events that occur during a well's lifetime. The cement sheath plays a critical role in establishing and maintaining zonal isolation in the well, supporting the casing and preventing external casing corrosion.\\n For many years, the industry has employed strategies to promote optimal cement placement results. These strategies, collectively known in the industry as good cementing practices. Job execution is the key to insure success of the job based on the designed.\\n New technology that give us optimum execution evaluation (OEE) has been developed to enhance cement job execution by overlapping the design parameter over with the execution parameter real time. The OEE technology significantly improves cementing operations, enabling operators to monitor, control, and evaluate cement placement in real time. OEE combines job design data with acquisition data from both the rig and the cementing equipment to provide a more accurate representation of the job as it is being run.\\n In this paper, we present the process that we completed with detailed operational setup to allow us to monitor and record all parameters related to the cement job execution and the work flow implemented to be able to evaluate the cement job design and execution to achieve the required objectives. This study is also setting the basis to establish development of real time automated cementing advisory system.\",\"PeriodicalId\":11150,\"journal\":{\"name\":\"Day 2 Wed, April 10, 2019\",\"volume\":\"49 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-04-08\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 2 Wed, April 10, 2019\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/194658-MS\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Wed, April 10, 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/194658-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

初次固井作业是一口井生命周期中最重要的作业之一。水泥环在建立和维持井中的层间隔离、支撑套管和防止外部套管腐蚀方面起着至关重要的作用。多年来,该行业一直采用各种策略来促进最佳固井效果。这些策略在业内被统称为良好的固井实践。作业执行是确保按设计完成作业的关键。为了提高固井作业的执行力,开发了一种新技术,可以通过实时叠加设计参数和执行参数来实现最佳执行力评估(OEE)。OEE技术显著改善了固井作业,使作业者能够实时监测、控制和评估固井位置。OEE将作业设计数据与来自钻机和固井设备的采集数据相结合,以提供更准确的作业表现。在本文中,我们介绍了我们完成的详细操作设置过程,使我们能够监控和记录与固井作业执行和工作流程相关的所有参数,以便能够评估固井作业的设计和执行,以实现所需的目标。本研究为建立开发实时自动化固井咨询系统奠定了基础。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Executing and Monitoring Cement Job Real Time
Primary cementing operations rank among the more important events that occur during a well's lifetime. The cement sheath plays a critical role in establishing and maintaining zonal isolation in the well, supporting the casing and preventing external casing corrosion. For many years, the industry has employed strategies to promote optimal cement placement results. These strategies, collectively known in the industry as good cementing practices. Job execution is the key to insure success of the job based on the designed. New technology that give us optimum execution evaluation (OEE) has been developed to enhance cement job execution by overlapping the design parameter over with the execution parameter real time. The OEE technology significantly improves cementing operations, enabling operators to monitor, control, and evaluate cement placement in real time. OEE combines job design data with acquisition data from both the rig and the cementing equipment to provide a more accurate representation of the job as it is being run. In this paper, we present the process that we completed with detailed operational setup to allow us to monitor and record all parameters related to the cement job execution and the work flow implemented to be able to evaluate the cement job design and execution to achieve the required objectives. This study is also setting the basis to establish development of real time automated cementing advisory system.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信