{"title":"线性调度在水渠施工中的应用及关键路径法的比较","authors":"P. Ramani, P. Selvaraj, S. T, Anshul Gupta","doi":"10.21315/jcdc2022.27.1.11","DOIUrl":null,"url":null,"abstract":"Critical path method (CPM) still remains the most commonly used scheduling technique, despite many studies confirming its shortcomings for scheduling repetitive construction projects. This research evaluated the case study of an alignment-based precast water canal erection project, which was originally planned with CPM and analysed the suitability of using linear scheduling method (LSM) for the same project. The case study project was scheduled using both CPM and LSM tools and the results were compared in terms of estimated total duration and resource cost. The results showed that LSM produced a saving of 10 days in total duration and 20.07% in estimated resource cost over CPM. LSM also proved to be the better tool in terms of other schedule attributes like resource assignment, levelling, visualisation, etc., for alignment-based projects. LSM can be highly efficient for scheduling different types of repetitive construction and offers benefits like better workflow and continuous resource usage.","PeriodicalId":51876,"journal":{"name":"Journal of Construction in Developing Countries","volume":"31 2 1","pages":""},"PeriodicalIF":0.8000,"publicationDate":"2022-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Application of Linear Scheduling in Water Canal Construction with a Comparison of Critical Path Method\",\"authors\":\"P. Ramani, P. Selvaraj, S. T, Anshul Gupta\",\"doi\":\"10.21315/jcdc2022.27.1.11\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Critical path method (CPM) still remains the most commonly used scheduling technique, despite many studies confirming its shortcomings for scheduling repetitive construction projects. This research evaluated the case study of an alignment-based precast water canal erection project, which was originally planned with CPM and analysed the suitability of using linear scheduling method (LSM) for the same project. The case study project was scheduled using both CPM and LSM tools and the results were compared in terms of estimated total duration and resource cost. The results showed that LSM produced a saving of 10 days in total duration and 20.07% in estimated resource cost over CPM. LSM also proved to be the better tool in terms of other schedule attributes like resource assignment, levelling, visualisation, etc., for alignment-based projects. LSM can be highly efficient for scheduling different types of repetitive construction and offers benefits like better workflow and continuous resource usage.\",\"PeriodicalId\":51876,\"journal\":{\"name\":\"Journal of Construction in Developing Countries\",\"volume\":\"31 2 1\",\"pages\":\"\"},\"PeriodicalIF\":0.8000,\"publicationDate\":\"2022-06-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Construction in Developing Countries\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.21315/jcdc2022.27.1.11\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"CONSTRUCTION & BUILDING TECHNOLOGY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Construction in Developing Countries","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21315/jcdc2022.27.1.11","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
Application of Linear Scheduling in Water Canal Construction with a Comparison of Critical Path Method
Critical path method (CPM) still remains the most commonly used scheduling technique, despite many studies confirming its shortcomings for scheduling repetitive construction projects. This research evaluated the case study of an alignment-based precast water canal erection project, which was originally planned with CPM and analysed the suitability of using linear scheduling method (LSM) for the same project. The case study project was scheduled using both CPM and LSM tools and the results were compared in terms of estimated total duration and resource cost. The results showed that LSM produced a saving of 10 days in total duration and 20.07% in estimated resource cost over CPM. LSM also proved to be the better tool in terms of other schedule attributes like resource assignment, levelling, visualisation, etc., for alignment-based projects. LSM can be highly efficient for scheduling different types of repetitive construction and offers benefits like better workflow and continuous resource usage.
期刊介绍:
The Journal of Construction in Developing Countries seeks to provide a central vehicle for the exchange and dissemination of knowledge on issues relevant to the built environment of developing countries. The journal provides a wide range of original research an application papers on current developments and advances in the built environment as well as the economic, social, cultural and technological contexts of developing countries. It also publishes detailed case studies, as well as short communications and discussions. Topics covered include, but are not restricted to planning, urban economics, rural and regional development, housing, management and resource issues, sustiainability, knowledge and technology transfer, construction procurement, facilities management, information an communication technologies, strategies and policy issues, design issues, conservation and environmental issues.