M. Turk, M. Pipan, M. Šimic, N. Herakovič
求助PDF
{"title":"基于仿真的基本手工装配任务时间评估","authors":"M. Turk, M. Pipan, M. Šimic, N. Herakovič","doi":"10.14743/apem2020.3.369","DOIUrl":null,"url":null,"abstract":"The paper presents a simple simulation model of the lifting procedure that can be used to predict the total time required for the sequence of basic manu‐ al assembly tasks depending on the various parameters of the load and with regard to the workers’ health. The aim of the research is to determine the appropriateness of using simulation tool for (re)setting time standards for manual assembly tasks. An avatar in the simulation model performs sequenc‐ es of tasks with a handling mass of up to 20.5 kg. The individual times ob‐ tained from the simulation model were analysed and compared with several time prediction methods and validated in laboratory environment. An analy‐ sis of the influence of different load parameters on the total time was also performed. Dependency is mostly linear, so from the practitioner point of view, we can predict with reasonable certainty the total time for any sequence of manual assembly tasks for every size and mass of the box. Based on the results we can confirm that simulation tool JACK is suitable not only for ergo‐ nomic analyses but also for setting time standards for the workers. Further‐ more, with the simulation tool we analyse the process and get the accurate results in shorter time compared to other mentioned methods. © 2020 CPE, University of Maribor. All rights reserved.","PeriodicalId":48763,"journal":{"name":"Advances in Production Engineering & Management","volume":"1 1","pages":"331-344"},"PeriodicalIF":2.8000,"publicationDate":"2020-09-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":"{\"title\":\"Simulation-based time evaluation of basic manual assembly tasks\",\"authors\":\"M. Turk, M. Pipan, M. Šimic, N. Herakovič\",\"doi\":\"10.14743/apem2020.3.369\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The paper presents a simple simulation model of the lifting procedure that can be used to predict the total time required for the sequence of basic manu‐ al assembly tasks depending on the various parameters of the load and with regard to the workers’ health. The aim of the research is to determine the appropriateness of using simulation tool for (re)setting time standards for manual assembly tasks. An avatar in the simulation model performs sequenc‐ es of tasks with a handling mass of up to 20.5 kg. The individual times ob‐ tained from the simulation model were analysed and compared with several time prediction methods and validated in laboratory environment. An analy‐ sis of the influence of different load parameters on the total time was also performed. Dependency is mostly linear, so from the practitioner point of view, we can predict with reasonable certainty the total time for any sequence of manual assembly tasks for every size and mass of the box. Based on the results we can confirm that simulation tool JACK is suitable not only for ergo‐ nomic analyses but also for setting time standards for the workers. Further‐ more, with the simulation tool we analyse the process and get the accurate results in shorter time compared to other mentioned methods. © 2020 CPE, University of Maribor. All rights reserved.\",\"PeriodicalId\":48763,\"journal\":{\"name\":\"Advances in Production Engineering & Management\",\"volume\":\"1 1\",\"pages\":\"331-344\"},\"PeriodicalIF\":2.8000,\"publicationDate\":\"2020-09-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"7\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Advances in Production Engineering & Management\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.14743/apem2020.3.369\",\"RegionNum\":3,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"ENGINEERING, MANUFACTURING\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Advances in Production Engineering & Management","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.14743/apem2020.3.369","RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"ENGINEERING, MANUFACTURING","Score":null,"Total":0}
引用次数: 7
引用
批量引用