容性电流补偿配电网接地故障有效抑制的条件

A. Shirkovets, A. Telegin, D. Kochura
{"title":"容性电流补偿配电网接地故障有效抑制的条件","authors":"A. Shirkovets, A. Telegin, D. Kochura","doi":"10.1109/PQ.2016.7724131","DOIUrl":null,"url":null,"abstract":"The paper presents the analysis of main reasons and consequences of the decrease of the efficiency for suppression of single phase-to-ground faults causing dangerous technological failures and faults in distribution networks. Advantages and disadvantages of main systems for partial or full compensation of a ground fault current used for minimizing losses are described. Comparative calculations on the emergency tripping probability due to the development of a single phase-to-ground fault into phase-to-phase short circuit in compensated and ungrounded networks are given. Based on the experience of manufacture and operation, technical requirements to arc suppression devices and their compensation automation systems are developed.","PeriodicalId":6470,"journal":{"name":"2016 Electric Power Quality and Supply Reliability (PQ)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2016-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Conditions for effective ground fault suppression in distribution networks with capacitive current compensation\",\"authors\":\"A. Shirkovets, A. Telegin, D. Kochura\",\"doi\":\"10.1109/PQ.2016.7724131\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The paper presents the analysis of main reasons and consequences of the decrease of the efficiency for suppression of single phase-to-ground faults causing dangerous technological failures and faults in distribution networks. Advantages and disadvantages of main systems for partial or full compensation of a ground fault current used for minimizing losses are described. Comparative calculations on the emergency tripping probability due to the development of a single phase-to-ground fault into phase-to-phase short circuit in compensated and ungrounded networks are given. Based on the experience of manufacture and operation, technical requirements to arc suppression devices and their compensation automation systems are developed.\",\"PeriodicalId\":6470,\"journal\":{\"name\":\"2016 Electric Power Quality and Supply Reliability (PQ)\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-08-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2016 Electric Power Quality and Supply Reliability (PQ)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PQ.2016.7724131\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 Electric Power Quality and Supply Reliability (PQ)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PQ.2016.7724131","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

分析了配电网单相对地故障抑制效率下降,导致配电网出现危险技术故障和故障的主要原因和后果。描述了用于减少损耗的部分或全部补偿接地故障电流的主系统的优缺点。给出了补偿网络和不接地网络中由单相接地故障发展为相对相短路的紧急跳闸概率的比较计算。根据制造和运行的经验,提出了消弧装置及其补偿自动化系统的技术要求。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Conditions for effective ground fault suppression in distribution networks with capacitive current compensation
The paper presents the analysis of main reasons and consequences of the decrease of the efficiency for suppression of single phase-to-ground faults causing dangerous technological failures and faults in distribution networks. Advantages and disadvantages of main systems for partial or full compensation of a ground fault current used for minimizing losses are described. Comparative calculations on the emergency tripping probability due to the development of a single phase-to-ground fault into phase-to-phase short circuit in compensated and ungrounded networks are given. Based on the experience of manufacture and operation, technical requirements to arc suppression devices and their compensation automation systems are developed.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信