{"title":"固井后压力测试:油井套管设计中的分析","authors":"A. Vitorino, L. F. Machado, T. V. Silva, J. P. N. Araújo, L. P. Gouveia, J. P. L. Santos","doi":"10.5419/BJPG2018-0022","DOIUrl":null,"url":null,"abstract":"This work discusses the load criteria known as pressure test after waiting-on-cement (WOC) through a detailed explanation of the calculation methodology and study cases. Well casing design is an important step on hydrocarbon exploration planning. New methodologies in this subject allows improvement on well structural integrity combined with time and costs reductions. In routine procedures, design may consider pressure test after WOC, which is an essential operation for cementation failures verification. During test pumping, additional loads are applied to the casing and, when combined, they must be lower than tubular resistances to ensure no failure, avoiding catastrophic consequences. The computational tool CWELL is used for analyzing a production casing string set next to the reservoir, submitted to the pressure test after WOC. Investigating different grades and linear weights on API tubes verifies the achievement of well safety requirements. Results indicate the importance of performing integrated analyzes to guarantee wells stability.","PeriodicalId":9312,"journal":{"name":"Brazilian Journal of Petroleum and Gas","volume":"13 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-01-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"PRESSURE TEST AFTER WAIT ON CEMENT (WOC): ANALYSIS IN OIL WELL CASING DESIGN\",\"authors\":\"A. Vitorino, L. F. Machado, T. V. Silva, J. P. N. Araújo, L. P. Gouveia, J. P. L. Santos\",\"doi\":\"10.5419/BJPG2018-0022\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This work discusses the load criteria known as pressure test after waiting-on-cement (WOC) through a detailed explanation of the calculation methodology and study cases. Well casing design is an important step on hydrocarbon exploration planning. New methodologies in this subject allows improvement on well structural integrity combined with time and costs reductions. In routine procedures, design may consider pressure test after WOC, which is an essential operation for cementation failures verification. During test pumping, additional loads are applied to the casing and, when combined, they must be lower than tubular resistances to ensure no failure, avoiding catastrophic consequences. The computational tool CWELL is used for analyzing a production casing string set next to the reservoir, submitted to the pressure test after WOC. Investigating different grades and linear weights on API tubes verifies the achievement of well safety requirements. Results indicate the importance of performing integrated analyzes to guarantee wells stability.\",\"PeriodicalId\":9312,\"journal\":{\"name\":\"Brazilian Journal of Petroleum and Gas\",\"volume\":\"13 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-01-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Brazilian Journal of Petroleum and Gas\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5419/BJPG2018-0022\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Brazilian Journal of Petroleum and Gas","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5419/BJPG2018-0022","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

本文通过对计算方法和研究案例的详细解释,讨论了被称为“水泥等待后压力测试”(WOC)的载荷标准。井套设计是油气勘探规划的重要环节。该领域的新方法可以提高油井结构的完整性,同时降低时间和成本。在常规程序中,设计人员可以考虑WOC后的压力测试,这是验证固井失效的基本操作。在测试泵送过程中,额外的载荷被施加到套管上,当组合时,它们必须低于管柱阻力,以确保不发生故障,避免灾难性后果。CWELL计算工具用于分析储层旁边的生产套管柱,并在WOC后进行压力测试。通过对API管进行不同等级和线性重量的研究,验证了其达到了油井安全要求。结果表明,进行综合分析对保证井的稳定性具有重要意义。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
PRESSURE TEST AFTER WAIT ON CEMENT (WOC): ANALYSIS IN OIL WELL CASING DESIGN
This work discusses the load criteria known as pressure test after waiting-on-cement (WOC) through a detailed explanation of the calculation methodology and study cases. Well casing design is an important step on hydrocarbon exploration planning. New methodologies in this subject allows improvement on well structural integrity combined with time and costs reductions. In routine procedures, design may consider pressure test after WOC, which is an essential operation for cementation failures verification. During test pumping, additional loads are applied to the casing and, when combined, they must be lower than tubular resistances to ensure no failure, avoiding catastrophic consequences. The computational tool CWELL is used for analyzing a production casing string set next to the reservoir, submitted to the pressure test after WOC. Investigating different grades and linear weights on API tubes verifies the achievement of well safety requirements. Results indicate the importance of performing integrated analyzes to guarantee wells stability.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信