{"title":"胶体硅胶的油田应用","authors":"J. J. Jurinak, L. Summers","doi":"10.2118/18505-PA","DOIUrl":null,"url":null,"abstract":"This paper reports on a practical reservoir fluid-flow control system based on colloidal silica gel that was developed. Colloidal silica gel is an environmentally benign system that provides easy surface handling, reliable gel-time control at temperatures up to 250{degrees} F, and high in-situ performance. Extensive laboratory testing was completed and is discussed elsewhere. Colloidal silica gel has been used in 11 well work-overs for water-injection-profile modification (four wells), water-production control (three wells), and remedial casing repair (four wells). Only one of the four injection-well treatments was a clear-cut technical success, with failure typically caused by pressure parting the gel plug after the well treatment. Two of the three water-production-control jobs were technical and economic successes. Temporary success was achieved in three of the four casing-repair treatments.","PeriodicalId":22020,"journal":{"name":"Spe Production Engineering","volume":"4 1","pages":"406-412"},"PeriodicalIF":0.0000,"publicationDate":"1991-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"80","resultStr":"{\"title\":\"Oilfield applications of colloidal silica gel\",\"authors\":\"J. J. Jurinak, L. Summers\",\"doi\":\"10.2118/18505-PA\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper reports on a practical reservoir fluid-flow control system based on colloidal silica gel that was developed. Colloidal silica gel is an environmentally benign system that provides easy surface handling, reliable gel-time control at temperatures up to 250{degrees} F, and high in-situ performance. Extensive laboratory testing was completed and is discussed elsewhere. Colloidal silica gel has been used in 11 well work-overs for water-injection-profile modification (four wells), water-production control (three wells), and remedial casing repair (four wells). Only one of the four injection-well treatments was a clear-cut technical success, with failure typically caused by pressure parting the gel plug after the well treatment. Two of the three water-production-control jobs were technical and economic successes. Temporary success was achieved in three of the four casing-repair treatments.\",\"PeriodicalId\":22020,\"journal\":{\"name\":\"Spe Production Engineering\",\"volume\":\"4 1\",\"pages\":\"406-412\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1991-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"80\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Spe Production Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/18505-PA\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Spe Production Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/18505-PA","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
This paper reports on a practical reservoir fluid-flow control system based on colloidal silica gel that was developed. Colloidal silica gel is an environmentally benign system that provides easy surface handling, reliable gel-time control at temperatures up to 250{degrees} F, and high in-situ performance. Extensive laboratory testing was completed and is discussed elsewhere. Colloidal silica gel has been used in 11 well work-overs for water-injection-profile modification (four wells), water-production control (three wells), and remedial casing repair (four wells). Only one of the four injection-well treatments was a clear-cut technical success, with failure typically caused by pressure parting the gel plug after the well treatment. Two of the three water-production-control jobs were technical and economic successes. Temporary success was achieved in three of the four casing-repair treatments.