{"title":"评价基苏木县综合监测和评价系统的运作情况:对决策者的影响","authors":"Enock Warinda","doi":"10.4102/AEJ.V7I1.385","DOIUrl":null,"url":null,"abstract":"Background: Evaluation findings are increasingly becoming valuable for policy makers in Kenya. The Directorate of Monitoring and Evaluation is responsible for providing reliable data findings for decision-makers. They are in turn expected to access the data and information through the National Integrated Monitoring and Evaluation System (NIMES). Unfortunately, the directorate hardly receives timely data as required, thus is unable to make timely decision within the ministry of agriculture, livestock and irrigation in Kisumu County.Objectives: The aim of this study was to assess the extent of operationalisation of NIMES through utilisation of the electronic project management information system (e-ProMIS) within the three agricultural departments.Methods: Through single-point face-to-face interviews using semi-structured questionnaires, mixed methods approach and Likert scale were applied to assess the level of operationalisation of, staff competences in, and satisfaction with NIMES. Both random and purposive sampling was used. Using mixed methods approach, primary and secondary data were collected from 10 key indicators and fitted in a binary logistic regression model to assess the level of operationalisation of NIMES.Results: This article shows that operationalisation of NIMES is unsatisfactory, and data collected are incorrectly formatted. None of the departmental personnel charged with uploading relevant data in e-ProMIS neither accessed nor utilised the platform. There were no champions supporting NIMES, thus no reports generated from the system.Conclusions: Factors hindering operationalisation of NIMES were: dysfunctional monitoring and evaluation (M&E) systems, limited human capacity on M&E, lack of NIMES champions, limited availability of data, unclear information flow to decision makers and inadequate integration of NIMES in planning and budgeting.","PeriodicalId":37531,"journal":{"name":"African Evaluation Journal","volume":"47 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-06-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Evaluating operationalisation of integrated monitoring and evaluation system in Kisumu County: Implications for policy makers\",\"authors\":\"Enock Warinda\",\"doi\":\"10.4102/AEJ.V7I1.385\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Background: Evaluation findings are increasingly becoming valuable for policy makers in Kenya. The Directorate of Monitoring and Evaluation is responsible for providing reliable data findings for decision-makers. They are in turn expected to access the data and information through the National Integrated Monitoring and Evaluation System (NIMES). Unfortunately, the directorate hardly receives timely data as required, thus is unable to make timely decision within the ministry of agriculture, livestock and irrigation in Kisumu County.Objectives: The aim of this study was to assess the extent of operationalisation of NIMES through utilisation of the electronic project management information system (e-ProMIS) within the three agricultural departments.Methods: Through single-point face-to-face interviews using semi-structured questionnaires, mixed methods approach and Likert scale were applied to assess the level of operationalisation of, staff competences in, and satisfaction with NIMES. Both random and purposive sampling was used. Using mixed methods approach, primary and secondary data were collected from 10 key indicators and fitted in a binary logistic regression model to assess the level of operationalisation of NIMES.Results: This article shows that operationalisation of NIMES is unsatisfactory, and data collected are incorrectly formatted. None of the departmental personnel charged with uploading relevant data in e-ProMIS neither accessed nor utilised the platform. There were no champions supporting NIMES, thus no reports generated from the system.Conclusions: Factors hindering operationalisation of NIMES were: dysfunctional monitoring and evaluation (M&E) systems, limited human capacity on M&E, lack of NIMES champions, limited availability of data, unclear information flow to decision makers and inadequate integration of NIMES in planning and budgeting.\",\"PeriodicalId\":37531,\"journal\":{\"name\":\"African Evaluation Journal\",\"volume\":\"47 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-06-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"African Evaluation Journal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4102/AEJ.V7I1.385\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"Social Sciences\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"African Evaluation Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4102/AEJ.V7I1.385","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Social Sciences","Score":null,"Total":0}
Evaluating operationalisation of integrated monitoring and evaluation system in Kisumu County: Implications for policy makers
Background: Evaluation findings are increasingly becoming valuable for policy makers in Kenya. The Directorate of Monitoring and Evaluation is responsible for providing reliable data findings for decision-makers. They are in turn expected to access the data and information through the National Integrated Monitoring and Evaluation System (NIMES). Unfortunately, the directorate hardly receives timely data as required, thus is unable to make timely decision within the ministry of agriculture, livestock and irrigation in Kisumu County.Objectives: The aim of this study was to assess the extent of operationalisation of NIMES through utilisation of the electronic project management information system (e-ProMIS) within the three agricultural departments.Methods: Through single-point face-to-face interviews using semi-structured questionnaires, mixed methods approach and Likert scale were applied to assess the level of operationalisation of, staff competences in, and satisfaction with NIMES. Both random and purposive sampling was used. Using mixed methods approach, primary and secondary data were collected from 10 key indicators and fitted in a binary logistic regression model to assess the level of operationalisation of NIMES.Results: This article shows that operationalisation of NIMES is unsatisfactory, and data collected are incorrectly formatted. None of the departmental personnel charged with uploading relevant data in e-ProMIS neither accessed nor utilised the platform. There were no champions supporting NIMES, thus no reports generated from the system.Conclusions: Factors hindering operationalisation of NIMES were: dysfunctional monitoring and evaluation (M&E) systems, limited human capacity on M&E, lack of NIMES champions, limited availability of data, unclear information flow to decision makers and inadequate integration of NIMES in planning and budgeting.
期刊介绍:
The journal publishes high quality peer-reviewed articles merit on any subject related to evaluation, and provide targeted information of professional interest to members of AfrEA and its national associations. Aims of the African Evaluation Journal (AEJ): -AEJ aims to be a high-quality, peer-reviewed journal that builds evaluation-related knowledge and practice in support of effective developmental policies on the African continent. -AEJ aims to provide a communication platform for scholars and practitioners of evaluation to share and debate ideas about evaluation theory and practice in Africa. -AEJ aims to promote cross-fertilisation of ideas and methodologies between countries and between evaluation scholars and practitioners in the developed and developing world. -AEJ aims to promote evaluation scholarship and authorship, and a culture of peer-review in the African evaluation community.