公用事业规模的光伏+电池系统中的电价套利

Q4 Energy
R. Dufo-López, J. Lujano-Rojas, J. Bernal-Agustín, J. S. Artal-Sevil, Á. Bayod-Rújula, Tomás Cortés-Arcos, Javier Carroquino-Oñate, Cristina Escriche Martínez
{"title":"公用事业规模的光伏+电池系统中的电价套利","authors":"R. Dufo-López, J. Lujano-Rojas, J. Bernal-Agustín, J. S. Artal-Sevil, Á. Bayod-Rújula, Tomás Cortés-Arcos, Javier Carroquino-Oñate, Cristina Escriche Martínez","doi":"10.24084/repqj21.207","DOIUrl":null,"url":null,"abstract":"In this paper, we use MHOGA software for the optimization of an AC-coupled utility-scale PV-plus-battery system. Batteries are used for price arbitrage, being charged with the photovoltaic (PV) generation during hours of low electricity price and discharged during hours of high price. The correct estimation of the battery lifetime has great importance in the calculation of the net present value, to do this advanced models for estimating the Li-ion battery lifetime (considering cycle and calendar ageing) are used. With present components costs, considering the Spanish SPOT price of 2021 with an expected increase of 1% annual, the AC coupled utility-scale PV-plusbattery isn’t economically viable comparing to the PV-only system. If electricity hourly price was multiplied by two, in certain cases adding battery to the PV system would be profitable.","PeriodicalId":21076,"journal":{"name":"Renewable Energy and Power Quality Journal","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Electricity price arbitrage in utility-scale PV-plus-battery systems\",\"authors\":\"R. Dufo-López, J. Lujano-Rojas, J. Bernal-Agustín, J. S. Artal-Sevil, Á. Bayod-Rújula, Tomás Cortés-Arcos, Javier Carroquino-Oñate, Cristina Escriche Martínez\",\"doi\":\"10.24084/repqj21.207\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this paper, we use MHOGA software for the optimization of an AC-coupled utility-scale PV-plus-battery system. Batteries are used for price arbitrage, being charged with the photovoltaic (PV) generation during hours of low electricity price and discharged during hours of high price. The correct estimation of the battery lifetime has great importance in the calculation of the net present value, to do this advanced models for estimating the Li-ion battery lifetime (considering cycle and calendar ageing) are used. With present components costs, considering the Spanish SPOT price of 2021 with an expected increase of 1% annual, the AC coupled utility-scale PV-plusbattery isn’t economically viable comparing to the PV-only system. If electricity hourly price was multiplied by two, in certain cases adding battery to the PV system would be profitable.\",\"PeriodicalId\":21076,\"journal\":{\"name\":\"Renewable Energy and Power Quality Journal\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-07-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Renewable Energy and Power Quality Journal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.24084/repqj21.207\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"Energy\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Renewable Energy and Power Quality Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24084/repqj21.207","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Energy","Score":null,"Total":0}
引用次数: 0

摘要

在本文中,我们使用MHOGA软件对一个交流耦合的公用事业规模的光伏+电池系统进行优化。利用电池进行价格套利,在电价低的时段进行光伏发电充电,在电价高的时段进行放电。电池寿命的正确估计在净现值的计算中具有重要意义,为此使用了先进的锂离子电池寿命估计模型(考虑循环和日历老化)。鉴于目前的组件成本,考虑到2021年西班牙现货价格预计每年增长1%,与纯光伏系统相比,交流耦合公用事业规模的光伏+电池在经济上并不可行。如果每小时电价乘以2,在某些情况下,为光伏系统增加电池将是有利可图的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Electricity price arbitrage in utility-scale PV-plus-battery systems
In this paper, we use MHOGA software for the optimization of an AC-coupled utility-scale PV-plus-battery system. Batteries are used for price arbitrage, being charged with the photovoltaic (PV) generation during hours of low electricity price and discharged during hours of high price. The correct estimation of the battery lifetime has great importance in the calculation of the net present value, to do this advanced models for estimating the Li-ion battery lifetime (considering cycle and calendar ageing) are used. With present components costs, considering the Spanish SPOT price of 2021 with an expected increase of 1% annual, the AC coupled utility-scale PV-plusbattery isn’t economically viable comparing to the PV-only system. If electricity hourly price was multiplied by two, in certain cases adding battery to the PV system would be profitable.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Renewable Energy and Power Quality Journal
Renewable Energy and Power Quality Journal Energy-Energy Engineering and Power Technology
CiteScore
0.70
自引率
0.00%
发文量
147
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信