{"title":"高压高压射孔系统的研制","authors":"B. Grove, T MacgillivrayJoseph, Cook Jason Karl, C HoelscherChristopher","doi":"10.4043/31167-ms","DOIUrl":null,"url":null,"abstract":"\n An operator was developing a High-Pressure High-Temperature (HPHT) field in the U.S. Gulf of Mexico (GOM). Completion design for the injector wells was cased-and-perforated, with no mechanical sand control. This led to the requirement for a tubing-conveyed perforating (TCP) system, featuring deep-penetrating (DP) charges which would meet specific performance requirements, in order to enable the wells to achieve injectivity targets.\n A perforating system was therefore developed and qualified to meet these requirements. This was an integrated system development, including both mechanical and explosive components, with simultaneous attention to performance, reliability, and quality assurance in the eventual field environment.\n The development program yielded a 4-3/4-inch carrier system, perforating charges, firing head, and gun hanger. All key components and systems were qualified in customer-witnessed testing, and demonstrated to meet or exceed operational function and performance requirements.\n The pressure and temperature rating of the newly-developed system is 30,000 psi at 425 °F. Explosive train function reliability was demonstrated at 380 °F for up to 28 days. The newly-developed perforating shaped charge was confirmed to exceed the stringent penetration depth and casing hole diameter performance requirements at downhole conditions. The firing head offers operational flexibility by being configurable for up to 15 pressure cycles prior to detonation, with an adjustable initiation threshold pressure to reduce risk to the completion string. The gun hanger was customized and demonstrated to exceed load requirements, and reliably set and release, in a test configuration featuring operator-provided field casing.","PeriodicalId":11072,"journal":{"name":"Day 1 Mon, August 16, 2021","volume":"108 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-08-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Development of Perforating System for Unique HPHT Injection Application\",\"authors\":\"B. Grove, T MacgillivrayJoseph, Cook Jason Karl, C HoelscherChristopher\",\"doi\":\"10.4043/31167-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n An operator was developing a High-Pressure High-Temperature (HPHT) field in the U.S. Gulf of Mexico (GOM). Completion design for the injector wells was cased-and-perforated, with no mechanical sand control. This led to the requirement for a tubing-conveyed perforating (TCP) system, featuring deep-penetrating (DP) charges which would meet specific performance requirements, in order to enable the wells to achieve injectivity targets.\\n A perforating system was therefore developed and qualified to meet these requirements. This was an integrated system development, including both mechanical and explosive components, with simultaneous attention to performance, reliability, and quality assurance in the eventual field environment.\\n The development program yielded a 4-3/4-inch carrier system, perforating charges, firing head, and gun hanger. All key components and systems were qualified in customer-witnessed testing, and demonstrated to meet or exceed operational function and performance requirements.\\n The pressure and temperature rating of the newly-developed system is 30,000 psi at 425 °F. Explosive train function reliability was demonstrated at 380 °F for up to 28 days. The newly-developed perforating shaped charge was confirmed to exceed the stringent penetration depth and casing hole diameter performance requirements at downhole conditions. The firing head offers operational flexibility by being configurable for up to 15 pressure cycles prior to detonation, with an adjustable initiation threshold pressure to reduce risk to the completion string. The gun hanger was customized and demonstrated to exceed load requirements, and reliably set and release, in a test configuration featuring operator-provided field casing.\",\"PeriodicalId\":11072,\"journal\":{\"name\":\"Day 1 Mon, August 16, 2021\",\"volume\":\"108 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-08-09\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 1 Mon, August 16, 2021\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4043/31167-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 1 Mon, August 16, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4043/31167-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

一家作业公司在美国墨西哥湾(GOM)开发一个高压高温(HPHT)油田。注水井的完井设计是套管射孔,没有机械防砂。这导致了对油管输送射孔(TCP)系统的需求,该系统具有满足特定性能要求的深穿透(DP)装药,以使油井达到注入能力目标。因此,射孔系统得以开发并满足这些要求。这是一个综合系统开发,包括机械和爆炸组件,同时关注最终现场环境中的性能、可靠性和质量保证。开发项目生产了一个4-3/4英寸的载体系统、射孔药、发射头和枪悬挂器。所有关键部件和系统都经过了客户见证的测试,并证明满足或超过了操作功能和性能要求。新开发的系统在425°F下的压力和温度额定值为30,000 psi。爆炸列车功能的可靠性在380°F下被证明长达28天。经证实,新开发的聚能射孔药在井下条件下超过了严格的贯深和套管孔径性能要求。点火头在起爆前可配置多达15个压力循环,具有可调的起爆阈值压力,从而降低完井管柱的风险,从而提供了操作灵活性。在作业公司提供的现场套管的测试配置中,该枪悬挂器经过了定制,并被证明超过了负载要求,并且可靠地安装和释放。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Development of Perforating System for Unique HPHT Injection Application
An operator was developing a High-Pressure High-Temperature (HPHT) field in the U.S. Gulf of Mexico (GOM). Completion design for the injector wells was cased-and-perforated, with no mechanical sand control. This led to the requirement for a tubing-conveyed perforating (TCP) system, featuring deep-penetrating (DP) charges which would meet specific performance requirements, in order to enable the wells to achieve injectivity targets. A perforating system was therefore developed and qualified to meet these requirements. This was an integrated system development, including both mechanical and explosive components, with simultaneous attention to performance, reliability, and quality assurance in the eventual field environment. The development program yielded a 4-3/4-inch carrier system, perforating charges, firing head, and gun hanger. All key components and systems were qualified in customer-witnessed testing, and demonstrated to meet or exceed operational function and performance requirements. The pressure and temperature rating of the newly-developed system is 30,000 psi at 425 °F. Explosive train function reliability was demonstrated at 380 °F for up to 28 days. The newly-developed perforating shaped charge was confirmed to exceed the stringent penetration depth and casing hole diameter performance requirements at downhole conditions. The firing head offers operational flexibility by being configurable for up to 15 pressure cycles prior to detonation, with an adjustable initiation threshold pressure to reduce risk to the completion string. The gun hanger was customized and demonstrated to exceed load requirements, and reliably set and release, in a test configuration featuring operator-provided field casing.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信