推迟改造能省钱吗?

Stig-Inge Gustafsson
{"title":"推迟改造能省钱吗?","authors":"Stig-Inge Gustafsson","doi":"10.1016/0890-4332(95)90055-1","DOIUrl":null,"url":null,"abstract":"<div><p>When a building is to be retrofitted, or refurbished, it is always of importance to study the building as a complete energy system. At least in Sweden, the building process is divided between different professional categories, such as HVAC and ordinary building contractors. It is therefore not surprising that the HVAC contractor wants to maximise his profit by installing large and sophisticated equipment at the same time as the builder or architect wants to design a house with very thick walls and high performing windows. These competing interests will often result in a building where the heating system is not adjusted to the rest of the house, but is instead far too powerful. The recommendation from life-cycle cost analyses has therefore always been to study the building as a whole system and to apply an optimal solution at one specific base year; this is probably always the best solution in order to minimise the life cycle cost, but experience shows that the proprietor of the building often hesitates in doing so. The reason for this is his lack of money. Changing the building into an optimal energy system frequently requires a heavy investment in any one specific year, albeit the best solution in the long run. This paper will discuss what happens to the life-cycle cost when retrofits are postponed so as to fit into the proprietor's “10 yr budget”.</p></div>","PeriodicalId":100603,"journal":{"name":"Heat Recovery Systems and CHP","volume":"15 5","pages":"Pages 469-472"},"PeriodicalIF":0.0000,"publicationDate":"1995-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0890-4332(95)90055-1","citationCount":"2","resultStr":"{\"title\":\"Does postponed retrofitting save money?\",\"authors\":\"Stig-Inge Gustafsson\",\"doi\":\"10.1016/0890-4332(95)90055-1\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>When a building is to be retrofitted, or refurbished, it is always of importance to study the building as a complete energy system. At least in Sweden, the building process is divided between different professional categories, such as HVAC and ordinary building contractors. It is therefore not surprising that the HVAC contractor wants to maximise his profit by installing large and sophisticated equipment at the same time as the builder or architect wants to design a house with very thick walls and high performing windows. These competing interests will often result in a building where the heating system is not adjusted to the rest of the house, but is instead far too powerful. The recommendation from life-cycle cost analyses has therefore always been to study the building as a whole system and to apply an optimal solution at one specific base year; this is probably always the best solution in order to minimise the life cycle cost, but experience shows that the proprietor of the building often hesitates in doing so. The reason for this is his lack of money. Changing the building into an optimal energy system frequently requires a heavy investment in any one specific year, albeit the best solution in the long run. This paper will discuss what happens to the life-cycle cost when retrofits are postponed so as to fit into the proprietor's “10 yr budget”.</p></div>\",\"PeriodicalId\":100603,\"journal\":{\"name\":\"Heat Recovery Systems and CHP\",\"volume\":\"15 5\",\"pages\":\"Pages 469-472\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1995-07-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1016/0890-4332(95)90055-1\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Heat Recovery Systems and CHP\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/0890433295900551\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Heat Recovery Systems and CHP","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/0890433295900551","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

当建筑要进行改造或翻新时,将建筑作为一个完整的能源系统来研究总是很重要的。至少在瑞典,建筑过程分为不同的专业类别,如暖通空调和普通建筑承包商。因此,暖通空调承包商希望通过安装大型和复杂的设备来最大化他的利润,而建造者或建筑师想要设计一个具有非常厚的墙壁和高性能窗户的房子,这并不奇怪。这些相互竞争的利益往往会导致建筑物的供暖系统不适应房屋的其他部分,而是过于强大。因此,生命周期成本分析的建议一直是将建筑物作为一个整体系统进行研究,并在一个特定的基准年应用最佳解决方案;为了尽量减少生命周期成本,这可能总是最好的解决方案,但经验表明,建筑物的业主经常在这样做时犹豫不决。这样做的原因是他缺钱。虽然从长远来看是最好的解决方案,但在任何特定的一年里,将建筑物改造成最佳能源系统通常都需要大量投资。本文将讨论为适应业主的“10年预算”而推迟改造时生命周期成本的变化。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Does postponed retrofitting save money?

When a building is to be retrofitted, or refurbished, it is always of importance to study the building as a complete energy system. At least in Sweden, the building process is divided between different professional categories, such as HVAC and ordinary building contractors. It is therefore not surprising that the HVAC contractor wants to maximise his profit by installing large and sophisticated equipment at the same time as the builder or architect wants to design a house with very thick walls and high performing windows. These competing interests will often result in a building where the heating system is not adjusted to the rest of the house, but is instead far too powerful. The recommendation from life-cycle cost analyses has therefore always been to study the building as a whole system and to apply an optimal solution at one specific base year; this is probably always the best solution in order to minimise the life cycle cost, but experience shows that the proprietor of the building often hesitates in doing so. The reason for this is his lack of money. Changing the building into an optimal energy system frequently requires a heavy investment in any one specific year, albeit the best solution in the long run. This paper will discuss what happens to the life-cycle cost when retrofits are postponed so as to fit into the proprietor's “10 yr budget”.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信