J. Karlsen, Hans Solli-Sæther, K. E. V. Oorschot, A. Vaagaasar
{"title":"当外包信息系统开发项目时,通过调整项目目标来管理信任和控制","authors":"J. Karlsen, Hans Solli-Sæther, K. E. V. Oorschot, A. Vaagaasar","doi":"10.1504/IJTM.2021.113693","DOIUrl":null,"url":null,"abstract":"This article presents a study of two projects focusing on the relationships of two Nordic clients with suppliers in low-cost countries. It explores the interplay between trust and control when offshoring information systems development projects. The key insight reveals that trust is not a substitute for control, no matter its level. The paper offers several contributions. First, we build a conceptual model for exploring the relationship between trust and control and the role of actual project performance. Second, the study reveals that trust supports a team's willingness to share knowledge, and control facilitates its ability to do so. Furthermore, our analysis shows that the impact of trust and control on project performance is better managed through the adjustment of project goals instead of adjusting the levels of trust and control. Finally, we contribute to theory through the development of a causal model of trust, control, actual performance, and project goals.","PeriodicalId":13637,"journal":{"name":"Int. J. Technol. Manag.","volume":"1 1","pages":"42-77"},"PeriodicalIF":0.0000,"publicationDate":"2021-03-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Managing trust and control when offshoring information systems development projects by adjusting project goals\",\"authors\":\"J. Karlsen, Hans Solli-Sæther, K. E. V. Oorschot, A. Vaagaasar\",\"doi\":\"10.1504/IJTM.2021.113693\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This article presents a study of two projects focusing on the relationships of two Nordic clients with suppliers in low-cost countries. It explores the interplay between trust and control when offshoring information systems development projects. The key insight reveals that trust is not a substitute for control, no matter its level. The paper offers several contributions. First, we build a conceptual model for exploring the relationship between trust and control and the role of actual project performance. Second, the study reveals that trust supports a team's willingness to share knowledge, and control facilitates its ability to do so. Furthermore, our analysis shows that the impact of trust and control on project performance is better managed through the adjustment of project goals instead of adjusting the levels of trust and control. Finally, we contribute to theory through the development of a causal model of trust, control, actual performance, and project goals.\",\"PeriodicalId\":13637,\"journal\":{\"name\":\"Int. J. Technol. Manag.\",\"volume\":\"1 1\",\"pages\":\"42-77\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-03-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Int. J. Technol. Manag.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1504/IJTM.2021.113693\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Int. J. Technol. Manag.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1504/IJTM.2021.113693","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Managing trust and control when offshoring information systems development projects by adjusting project goals
This article presents a study of two projects focusing on the relationships of two Nordic clients with suppliers in low-cost countries. It explores the interplay between trust and control when offshoring information systems development projects. The key insight reveals that trust is not a substitute for control, no matter its level. The paper offers several contributions. First, we build a conceptual model for exploring the relationship between trust and control and the role of actual project performance. Second, the study reveals that trust supports a team's willingness to share knowledge, and control facilitates its ability to do so. Furthermore, our analysis shows that the impact of trust and control on project performance is better managed through the adjustment of project goals instead of adjusting the levels of trust and control. Finally, we contribute to theory through the development of a causal model of trust, control, actual performance, and project goals.